

Add to Cart
ASME WPB A234 Carbon Steel Welding Pipe Connector Long Radius Elbow
Product Decription:
The elbows includes grooved elbows, bite type elbow, butt welding elbow, socket welding elbow. A butt weld pipe fitting is
designed to be welded on site at its ends to connect pipes together and allow change in direction,branching or ending. A butt
weld pipe fitting is designed to be welded on site at its ends to connect pipes together and allow change in direction, branching
or ending. The center to face distance for a "long" radius elbow, abbreviated LR always is "1½ x Nominal Pipe Size (NPS)
(1½D)", while the center to face distance for a "short" radius elbow, abbreviated SR even is to nominal pipe size. abbreviated
SR even is to nominal pipe size.
Size | 1/2’’~10’’(Seamless);12’’~72’’(Welded) |
Thickness | Sch5S~Sch160XXS |
Material | Carbon Steel,Stainless Steel,Nickel alloy steel |
Package | Wooden cases, pallets, nylon bags or according to the customers' requirements |
Delivery time | 10-100 days depending on quantity |
Payment terms | T/T or Western Union or LC |
Shipment | FCA Tianjin/Shanghai, CFR, CIF, etc |
Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc |
Remarks | Other materials and drawings are available. |
Detailed Images:
Elbows are split into two groups which define the distance over which they change direction; the center line
of one end to the opposite face. This is known as the "center to face" distance and is equivalent to the radius
through which the elbow is bent.
Packing & shipping:
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and
order quantity.
Advantages:
1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products EXPORT to Africa, Oceania, mid east, eastern Asia, Western Europe etc.
FAQ:
We are manufacturer ,You can see the Alibaba certification.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.