Screw Water Chiller Hot Sale In Industry Cooling Use With Cooling Tower

Brand Name:MGREENBELT
Certification:CE
Model Number:MG-100WS
Minimum Order Quantity:1 Set
Delivery Time:Within 20 working days
Payment Terms:T/T,L/C,D/P
Contact Now

Add to Cart

Active Member
Location: Ji'nan Shandong
Business type: Manufacturer, Exporter, TradingCompany, Seller
Address: Room 404,Chuangxin Building,Hualong Road, Jinan,Shandong,China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Screw Water Chiller Hot Sale In Industry Cooling Use With Cooling Tower

Technical Specification:

ProductScrew Water cooled chiller
ModelMG-90WS
Power supply3PH-220V380V/415V/460-50HZ/60HZ
Chilled water flow(m3/h)51
Total power consumption (kW)56.5
Cooling capacityKW290
kCal/hr249400
CompressorTypeSemi-hermetic screw
Quantity1
Start methodY
Energy control0-25%-50%-75%-100%( start @ 25%)
CondenserTypeShell and tube
Cooling water flow(m3/h)62
Quantity1
RefrigerantTypeR22/R407c/R134a
Expansion valveTypeThermostatic expansion valve
EvaporatorTypeShell and tube
Inlet/Outlet pipe dimensionPT4"
Safety protectionCompressor over temperature,over current,high and low pressure,Phase sequence,phase-missing
DimensionL*W*H(mm)2800*850*1700mm
Machine weightkg1800

Feature:

1.Water cooled water chiller adopt the World Name Brand Compressor:Bitzer, Hanbell;

2.Control system of water chiller has a capacity of 4, energy regulation: [0-25-50-75-100% ].Can be the basis of changes in load-conditioning Unit from the transport to stop and open and effective energy saving;

3.Run-time, computer-controlled cooling system of water chiller will be based on changes in thermal load to change the unit of energy output;

4.Stainless steel heat exchange, with automatic watering system, which has convenient and quick cleaning maintenance;
5.Highly effective live threshold energy quantity control, realizes the graduation or stepless energy control. The balanced design, revolves ultra static steady;

6.Moves the parts to process strictly ,wipes the row of gas oil counterbalance design specially, the maintence cycle is long ,the trouble-free moves above for 40000 hours.

Chiller Photo:


Working Diagram:

Working parts we provide: Cooling tower, chilled water pump( one use, one standby), cooling water pump( one use, one standby), water tank and other parts need based on clients project need.

Factory working:

Service:

Before order: Our team will supply you the water chiller solution, include working, installation, shipping and etc, all will based on your working condition, clients just inform us what you want.

After order:Engineer team Tel:0086-531-80960819, and also can email us, any support need we will response within 24 hours.

If any quality problem the news parts will be sent within 3 days, shiping charge by us.

Payment term:

T/T: 50% Down payment, the balance before shipment, or you also can show us if any special required.

L/C,D/P,DDU and etc.

Contact preson:Grace Zhang
Cell:0086018615626360(calling,whatspp,viber,weichat) Email:cnmgchiller@gmail.com
Skype:mb.gracezhang

Looking forward long and good cooperation from all over the world! MGREENBELT will give our agent price and good service.

China Screw Water Chiller Hot Sale In Industry Cooling Use With Cooling Tower supplier

Screw Water Chiller Hot Sale In Industry Cooling Use With Cooling Tower

Inquiry Cart 0