St52 Oiled Cold Drawn Seamless Steel Tube For Gas Cylinder

Brand Name:TORICH
Model Number:EN10305-1
Delivery Time:35-45days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Place of Origin:CHINA
Packaging Details:In wooden boxes or hexagonal bundles in seaworthy packing
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

St52 Hydraulic Steel Pipe Gas Cylinder Honed Tube


Manufacture Method: Cold drawn, hot rolled+deep hole bored
Gas Cylinder Honed Tube
Certification: ISO9001, SGS,
St52 Honed Tube
Material: Carbon steel,alloy steel, stainless steel

Standard & Grade:
DIN2391-2 ST52,EN10305-1 E355,C45E,25CrMo4,42CrMo4, CK45,E410, E470,ASTM A519 SAE1020,SAE1026,SAE1045,SAE1518,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,etc.

Size Range:
ID of 300mm max for cold drawing,
ID of 500mm for deep hole boring

ID Tolerance: ISO H8

End finish:
Plain ends with square cuts,free of burrs

Bore Roughness:
Ra0.30um max for honed tubes, Ra0.25um Max for Skived&roller burnished tubes

End finish:
Plain ends with square cuts,free of burrs

Usage:
Hydraulic cylinder, Pneumatic Cylinder

Product Feature:
1.High precision (can cut the costs of machining) .
2.Excellent surface finish
3.Good mechanical performance (Aneal ,Bright Anealing,QT heatment on steel tubes to reach customers' Mechanical requsts. )

1.+C /BK
No heat treatment after final cold drawing process.

2.+LC/BKW
After the final heat treatment there's a suitable drawing pass.

3.+SA/BKS
After the final cold drawing process there's a stress relief heat treatment in controlled atmosphere.

4.+A/GBK
After the cold drawing process the tubes are annealed in a controlled atmosphere.

5.+N/NBK

After the final cold drawing operation the tubes are normalized in a controlled atmosphere.

Product Pictures:



Company Introduction:

Packaging and Delivery:


FAQ:

Q: Are you trading company or manufacturer?

A: We are a professional steel pipes materials manufacturer.


Q: How long is your delivery time?

A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.


Q: Do you provide free sampleas?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: What is your terms of payment?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.

































China St52 Oiled Cold Drawn Seamless Steel Tube For Gas Cylinder supplier

St52 Oiled Cold Drawn Seamless Steel Tube For Gas Cylinder

Inquiry Cart 0