TORICH DIN2462 304l Stainless Steel Tube For Sputtering Target

Brand Name:TORICH
Certification:ISO9001; ISO14001; TSI16949
Model Number:DIN2462
Minimum Order Quantity:3 tons
Delivery Time:30-35 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

TORICH 304L Stainless Steel Tube for Sputtering Target Size ODxWTxLENGTH 133x4x4113mm

Grade:304L

Specification: 133*4*4113mm

Ellipticity: Roundness deviation≤0.10mm

Straightness deviation: Overall length direction≤0.5mm

Standard:DIN2462

Tolerance of OD0.1-0.4mm
Tolerance of ID124.5-125.2mm
Tolerance of Length-0/+10mm

Special requirements:

1. Quality requirements:

Tolerance of OD:0.1-0.4mm

Tolerance of ID:124.5-125.2mm Tolerance of Length:-0/+10mm

Ellipticity: Roundness deviation≤0.10mm

Straightness deviation: Overall length direction≤0.5mm

2. Appearance requirements:

The inner and outer surface of the steel pipe shall be free from visible cracks, scabs and deformation caused by bumping bow, and the surface roughness Ra<32um.

The outer end shall be free from deformation, elliptical notch and other defects, and the pipe body shall be free from pits(pits deeper than 0.1mm are not allowed on the inner wall of the steel pipe),inclusions and other defects. There shall be no scratch (0.1mm).

Dirt on the inner hole: there shall be no oil pollution inside and outside the steel pipe or dirt and rust that can not be removed by fine sandpaper.

3. Packing requirements:

Casing cap at both ends of steel pipe, woven bag packing

4. Requirements for lettering:

TP304L 138mm*4.4mm HEAT NO:×××

Note:(The size is only used ink-jet printing, the size of ink-jet printing should also be written on the outer package, not the length)

Application:

Planar Sputtering Target,

Alloy Sputtering Target

Cylindrical Ag alloy Sputtering Target

Metal Single Crystals

Product show:


Click it to know more


FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us


China TORICH DIN2462 304l Stainless Steel Tube For Sputtering Target supplier

TORICH DIN2462 304l Stainless Steel Tube For Sputtering Target

Inquiry Cart 0