TORICH E355 EN10305 Seamless Hydraulic Cylinder Tube

Brand Name:TORICH
Certification:ISO9001
Model Number:EN10305
Minimum Order Quantity:5Tons
Delivery Time:45-50 work days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

TORICH E355 EN10305 Seamless Pipe Hydraulic Cylinder Honed Tube


Material:

Carbon steel,alloy steel, stainless steel


Standard&Grade:

DIN2391-2 ST52,EN10305-1 E355,C45E,25CrMo4,42CrMo4, CK45,E410, E470,ASTM A519 SAE1020,

SAE1026,SAE1045,SAE1518,SAE1541, SAE4130,SAE4140,SAE4145,SAE4340,etc.


Size Range:

ID of 300mm max for cold drawing,

ID of 500mm for deep hole boring


ID Tolerance:

ISO H8


Manufacture Method:

Cold drawn, hot rolled+deep hole bored


End finish:

Plain ends with square cuts,free of burrs


Bore Roughness:

Ra0.30um max for honed tubes, Ra0.25um Max for Skived&roller burnished tubes

End finish:
Plain ends with square cuts,free of burrs


Usage:
Hydraulic cylinder, Pneumatic Cylinder


Certification:

ISO9001, SGS,


Product Feature:
1.High precision (can cut the costs of machining) .
2.Excellent surface finish
3.Good mechanical performance (Aneal ,Bright Anealing,QT heatment on steel tubes to reach customers' Mechanical requsts. )


1.+C /BK

No heat treatment after final cold drawing process.


2.+LC/BKW

After the final heat treatment there's a suitable drawing pass.


3.+SA/BKS

After the final cold drawing process there's a stress relief heat treatment in controlled atmosphere.


4.+A/GBK

After the cold drawing process the tubes are annealed in a controlled atmosphere.


5.+N/NBK

After the final cold drawing operation the tubes are normalized in a controlled atmosphere.

Products Show
Tubes Maching

ID Honing

Utilize an abrasive stone,which turns while being moved in and out of the work piece.

The honing process makes :
1.Smooth surface finishes inside bores
2.Hold precise tolerances on bore diameters

ID H7 H8 H9
ID roughness 0.2-0.8μm
ID max 630mm

Roller Burnish+ Skiving

Two thin chips are cut at high feed rate while the tool passes through the workpiece.producing super finish surface,with a bore precise tolerance .

ID H7 H8 H9
ID roughness 0.2-0.8μm
ID max 630mm

QUALITY CONTROL

1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking.

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

Packing & Delivery


Packing Details : In bundles or in wooden boxes packaging of honed tube
Delivery Details : 30-60days

In hexagonal bundles packaging with woven

In hexagonal shaps,the tubes will be well fixed,so it can avoid the damages when delievey .

In wooden boxes.

Solid packaging ,protecting tubes from damages much better.
In poywooden packaging,It cut the packaging costs also it can protect tubes well
ASTM A519 Hydraulic Cylinder Alloy Steel Mechanical Honed Tubing
In bundles with end caps.well protect tubes from rust.
Carton Packing suit for the cutting length
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples of honed tube ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.










China TORICH E355 EN10305 Seamless Hydraulic Cylinder Tube supplier

TORICH E355 EN10305 Seamless Hydraulic Cylinder Tube

Inquiry Cart 0