JIS G3461 Carbon Steel Tubes For Boiler And Heat Exchanger

Brand Name:TORICH
Model Number:JIS G3461
Delivery Time:35-45days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Place of Origin:CHINA
Packaging Details:In wooden boxes or hexagonal bundles in seaworthy packing
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

JIS G3461 Carbon Steel Tubes for Boiler and Heat Exchanger

Scope:JIS G3461 Carbon Steel Tubes is mainly used for exchanging heat on the inside and outside of the tube, such as water tubes, smoke tubes, superheater tubes, air preheater tubes, etc.Its application fields are: boiler tubes, heat exchanger tubes, condenser tubes, catalyzer tubes, etc. It can also be used in chemical and petroleum industries, But it can't be used for low temperature service.


Chemical Composition:

GradeProcessChemical Composition (%)
CSiMnPSNiCrMoOthers
STB35S, E0.18Max0.35Max0.30~0.600.035Max0.035Max----
STB42S, E0.32Max0.35Max0.30~0.600.035Max0.035Max----
STB52S, E0.25Max0.35Max1.00~1.500.035Max0.035Max----

Mechanical Properties:

Symbol of classTensile strength

N/mm2

{kgf/mm2}

Yield point or proof stress
N/mm2

{kgf/mm2}

Elongation %
Outside diameter 20mm or overOutside diameter 10mm or over to and excl. 10mmOutside diameter under 10mm
No. 11 test piece No. 12 test pieceNo. 11 test pieceNo. 11 test piece
STB340

STB410

STB510

340{35}min.

410{42} min.

510{52} min.

175{18} min.

255{26} min.

295{30} min.

35 min.

25 min.

25 min.

30 min.

20 min.

20 min.

27 min.

17 min.

17 min.

Manufacture Method:

Symbol of classHeat treatment
Hot finished seamless steel tubeCold finished seamless steel tubeElectric resistance welded steel tube other than hot finished or cold finished steel tubeFinished electric resistance welded steel tubeFold finished electric resistance welded steel tube
STB 340As manufactured, as required, low temperature annealing or normalizing may be performed.Low temperature annealing, normalizing or full annealing.NormalizingAs manufactured. However, as required, low temperature annealing or normalizing may be performed.Normalizing
STB 410As manufactured. However, as required, low temperature annealing or normalizing may be performed.Low temperature annealing, normalizing or full annealing.NormalizingLow temperature annealing
STB 510Normalizing

Product Pictures:



Company Introduction:

Packaging and Delivery:


FAQ:

Q: Are you trading company or manufacturer?

A: We are a professional steel pipes materials manufacturer.


Q: How long is your delivery time?

A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.


Q: Do you provide free sampleas?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: What is your terms of payment?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.




China JIS G3461 Carbon Steel Tubes For Boiler And Heat Exchanger supplier

JIS G3461 Carbon Steel Tubes For Boiler And Heat Exchanger

Inquiry Cart 0