GB/T3639 Structural and Machanical 10#, 20#, 45#, Seamless Precision Steel Tube

Brand Name:Torich
Certification:ISO
Model Number:GB/T 3639
Minimum Order Quantity:2 tons
Delivery Time:25-45 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

GB/T3639 Structural and Machanical 10#, 20#, 45#, Seamless Precision Steel Tube


Steel Grade/Steel Material:10#, 20#, 45#, etc
Steel pipe standard:GB/T 3639
Size:OD:10—110mm, WT:1.00—8.00mm, Length: 5.8m, 6m, 12m,or as required.

Technique: 1) Cold Rolled 2) Cold Drawn


Main feature:High precision, Excellent brightness, No oxidization on outer and inner walls after heat treatment

High cleanness of inside wall, High pressure, No deformation after clod bending, No crack after flaring and flattening


Application: 1) shock absorber for motorcycle and automobile, 2) hydraulic gas cylinder

3) precision machine precision pipe part, 4) other auto pipe parts


Production Processs:
RAW MATERIAL

INCOMING INSPECTION

STORAGE → CUTTING→HAMMERING → PICKING LUBRICATION → CLEANING → PHOSPHORI CLEAN

ENDS CUTTING←STRAIGHTENING←HEAT TREATMENT↔MIDDLLE CHECK↔ COLD DRAWING ← LUBRICATING

FINAL INSPECTION→BUNDING→STORAGE


Delivery Condition: BK(+C), BKW(+LC), BKS(+SR), GBK(+A),NBK( +N)

BK (+C) Cold finished/hard

No heat treatment after the last cold forming process.

BKW (+LC) Cold finished/soft

After the last heat treatment there is a light finishing pass (cold drawing).

BKS (+SR) Cold finished/stress relieve annealed.

After the final cold forming process the tubes are stress relieve annealed.

GBK (+A) Annealed.

After the final cold forming process the tubes are annealed in a controlled atmosphere.

NBK (+N) Normalized.

After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere

QUALITY CONTROL:

1. Incoming Raw Material Inspection

2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects


Production of Precision Steel Tube:


Packing and delivery


Our Certifications


FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider


Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
















China GB/T3639 Structural and Machanical 10#, 20#, 45#,  Seamless Precision Steel Tube supplier

GB/T3639 Structural and Machanical 10#, 20#, 45#, Seamless Precision Steel Tube

Inquiry Cart 0