Condenser Titanium ASTM B338 Alloy Steel Pipe

Brand Name:Torich
Certification:CE,ISO
Model Number:GB/T3624
Minimum Order Quantity:1 tons
Delivery Time:25-30 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

Torich GB/T 3624 TA1 TA2 Heat Exchanger Condemser Titanium Alloy Tubes


Brief introduction:

NameGB/T 3624 Titanium Alloy Heat Exchanger Tubes
StandardGB/T 3625, GB/T 3624,ASTM B338 ,ASTM B861 ,ASTM 4942 ,JIS H4630,JIS H4631,JIS H4635,DIN 17861,DIN 17866,GOST 24890, GOST 21945 ,GOST 22897 
GradeTA1,TA1ELI,TA2,TA2ELI,TA9,TA10
TypeAlloy
UsageHeat exchanger, condenser
Size rangeΦ(3-159)×(0.2-6.0) ×L Condition: Hot rolled
Φ(25-210)×(3.0-6.0) ×L Condition: Cold Rolled

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

Product show:


Q&A

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider


Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
Q:Do you have agent or distributor in our country?
A:We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.
Q: How is your production capability?
A: 1. 2000 tons monthly production capacity, 5000 tons monthly trading capability
2. Prompt and Timely shipment
Q:How to get the sample?
A:1. You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2. Sample charges will be refunded when order is placed.

QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking









China Condenser Titanium ASTM B338 Alloy Steel Pipe supplier

Condenser Titanium ASTM B338 Alloy Steel Pipe

Inquiry Cart 0