Welded Car Cuffler Exhaust Pipe For Truck ASTM A787 DC03 DC04 SA1D SA1C

Brand Name:TORICH
Certification:ISO9001, ISO14001, TS16949
Model Number:ASTM A787
Minimum Order Quantity:7 Tons
Delivery Time:30-45 work days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details
TORICH ASTM A787 DC03 DC04 SA1D SA1C Round Aluminized Welded Car Cuffler Exhaust Pipe for Truck
Quick Detail:
Product nameTORICH ASTM A787 DC03 DC04 SA1D SA1C Round Aluminized Welded Car Cuffler Exhaust Pipe for Truck
Steel GradeSPCC SPHC Q195 Q235 Q345 SAE1008 SAE1020 DX53 DX51 DC03 DC04 SA1C SA1D SA1E
Size RangeOD range:34-127mm WT range: 0.8-2.5mm
SurfaceGalvanized, Aluminized, Galvannealed
StandardASTM A787, ASTM A269, ASTM A554, ASTM A513 JIS G3445
ApplicationExhaust Manifold, Exhaust Pipe and Silencer etc
Production processTubes shall be made by the electric-resistance welding process and shall be made from hot or cold-rolled precoated steel.

Reference Standard:


ASTM A787: Electric-Resistance-Welded Metallic-Coated Carbon Steel Mechanical Tubing.


ASTM A269: Seamless and Welded Austenitic Stainless Steel Tubing for General Service.


ASTM A554: Welded Stainless Steel Mechanical Tubing


ASTM A513: Electric-Resistance-Welded Carbon and Alloy Steel Mechanical Tubing


JIS G3445: Carbon Steel Tubes for machine Structure


Product Show:


Application:

Our Certifications:

QUALITY CONTROL:
1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

FAQ:

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us









China Welded Car Cuffler Exhaust Pipe For Truck ASTM A787 DC03 DC04 SA1D SA1C supplier

Welded Car Cuffler Exhaust Pipe For Truck ASTM A787 DC03 DC04 SA1D SA1C

Inquiry Cart 0