ASTMB395 ASTM B111 Seamless Alloy Steel Tube Heat Exchanger Condenser U Bend Steel Tubes

Brand Name:Torich
Certification:API, CE, BSI, UL
Model Number:ASTMB395 ASTM B111
Minimum Order Quantity:5 tons
Delivery Time:45-60 working days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: Suite 1004, Hongan Plaza, #258 Die Yuan Road, Yinzhou District, Ningbo City, China
Supplier`s last login times: within 42 hours
Product Details Company Profile
Product Details

ASTM B395 Seamless Copper and Copper Alloy Heat Exchanger Condenser U-bend Steel Tubes


Product name:U bend steel tubes
Standard:ASTM B395,ASTM B111
Application:Heat exchanger, boiler,evaporator,condenser
Technical:Cold drawn
Surface Tratement:Oiled
Type:Seamless steel tube
Payment:T/T,L/C,Western Union, Money Gram
Terms of delivery:FOB,CIF,CFR,CPT,etc
Delivery time:45-60 working days
Certificate:ISO9001

Product show:



Production Workshop:


Packing&Shipping:


QUALITY CONTROL

1~ Incoming Raw Material Inspection
2~ Raw Material Segregation to avoid steel grade mix-up
3~ Heating and Hammering End for Cold Drawing
4~ Cold Drawing and Cold Rolling, on line inspection
5~ Heat Treatment, +A, +SRA, +LC, +N, Q+T
6~ Straightening-Cutting to specified length-Finished Measuring Inspection
7~ Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8~ Packing and Stocking.

A&Q

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample of SCM 440 42CrMo Mechanical Tubing for Reinforcement sleeve for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us

RFQ:

What is your Guarantee?
1.SO9001:2008 and TS16949 certification, SGS, BV, TUV or other third party inspection is available.
2.High quality with competitive price.
3.Advanced technology, experienced engineer, ISO quality system for quality assurance and traceability.

Do you have agent or distributor in our country?
1.We are recruiting area agent and distributor all over the world, welcome to send us your mail or call us for detail discussion.


How is your production capability?
1.2000 tons monthly production capacity, 5000 tons monthly trading capability
2.Prompt and Timely shipment

How to get the sample?
1.You are requested to pay for sample charges and courier charges from China to your country; and the free sample is according the product like size, steel grade and quantity, please consult our sales for details
2.Sample charges will be refunded when order is placed.

What is your Payment Term?
1.T/T: 30% deposit in advance, the balance 70% paid before shipment
2.30% down payment, the balance 70% paid against L/C at sight
3.Upon negotiation

Who are your customers?
1.Stockists, Distributors,Wholesalors,Agents, Traders, End Users, etc


How long will you react on our requirement?
1.Your requirement would be treated within 24 hours on weekdays. Quotations would be sent upon technical details confirmed by customer!

Any more questions about your doubts, please feel free to send us your emails or call!



















China ASTMB395 ASTM B111 Seamless Alloy Steel Tube Heat Exchanger Condenser U Bend Steel Tubes supplier

ASTMB395 ASTM B111 Seamless Alloy Steel Tube Heat Exchanger Condenser U Bend Steel Tubes

Inquiry Cart 0