Galvanized Framework Electric Substation Structure Components Steel Pole

Brand Name:JSBS
Certification:ISO9001:2008
Model Number:BS-2
Minimum Order Quantity:1 set
Delivery Time:within 15 working days
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Active Member
Address: Heqiao Industrial Zone, Yixing City, Jiangsu Province. China.
Supplier`s last login times: within 34 hours
Product Details Company Profile
Product Details

Galvanized Framework Electric Substation Structure Components Steel Pole


Description:


TypeSubstation Structure Frame
Suit forElectricity Network
Shapepolygonal
MaterialSteel
Tolerance of dimension+- 2%
Power10 KV ~550 KV
Safety FactorSafety factor for conducting wine: 8
Design Load in Kg300~ 1000 Kg applied to 50cm from the top pole
MarksName plate through rivet or glue, engrave, emboss as per customer requirement
Surface treatment

Hot dip galvanized with ASTM A 123, color as client required.

Joint of Poles

Insert mode, inner flange mode, face to face joint mode

Design of poleAgainst earthquake of 8 grade
Wind Speed160 Km/Hour . 30 m /s
Minimum yield strength355 mpa
Minimum ultimate tensile strength490 mpa
Max ultimate tensile strength620 mpa
StandardISO 9001
Length of per sectionWithin 14m once forming without slip joint
WeldingWelding Standard: AWS ( American Welding Society ) D 1.1
Thickness2.5 mm to 30 mm

Manufacturing Process

→Raw material test (We buy the raw material from famous mill factory here in China. We'll check the elements of the raw material like silicon, carbon, sulfur etc. in our lab test room. If they are unqualified, we'll return them. In this way, we can control the quality from the first beginning.)


→ Cutting


→Bending (imported 1600Tons Hydraulic Bending Machine)


→Welding (longitudinal penetration rate over 95%)


→Dimension verify

→Flange welding

→Hole drilling

→sample assemble

→ surface clean

→ Galvanization or powder coating, painting

→Recalibration

→Packages


After the fabrication process as cutting plate, bending, forming, automatic welding, drilling holes, we get poles checked before galvanized, hot dip galvanized and powder coating and finally we get poles checked according to client's requirements.


To ensure the quality, we have professional technicians to check the pole during the manufacturing and before delivery.


FAQ

1. Price Term: EXW, FOB, CFR or CIF.

  • The price includes pole shaft, base plate, crossarm and anchor bolt.

  • Shipping seaport: Shanghai Seaport.

  • Please provide drawings if you have so that we can calculate the accurate price for you.

  • We also provide design according to your requests, if you don't have drawings.

2. MOQ: One 40FT Container.

3. Payment Term: Typically 30% by T/T as a deposit, balance by T/T or L/C at sight before shipment. Other payment ways can be negotiated.

4. Delivery Time: 2 weeks per container after PO/drawing/prepayment confirmed.

5. Package: Normally wrapped by plastical bags or burlap cloth at the top and bottom, or according to clients requirement.

China Galvanized Framework Electric Substation Structure Components Steel Pole supplier

Galvanized Framework Electric Substation Structure Components Steel Pole

Inquiry Cart 0