Add to Cart
Wall Angle Roll Forming Machine
Technical Parameter
Material of coil | Material Thickness | 3mm galvanized sheet |
Forming system | Rolling Speed | About 15 m/min line speed |
Roller Stations | About 9 stations total | |
Roller Material | 45# Steel with quenching | |
Maim Motor Power | 5.5 kW | |
Hydraulic cutting Power | 4 kW | |
Cuttingsystem | Material Of Cutting | CR12 with quench treatment |
Hardness | HRC58-62 | |
Tolerance | +-1.5mm | |
Electrical control system | Electric Source | 380V, 50HZ,3 phase Also can satisfy Customer’s require |
Control System | PLC control system | |
Weight | About 2.5 tons | |
Way Of Drive | 1 inch single chain | |
Size of machine | Length 4500* Width 500* Height 800mm |
Work Flow Chart
A. Passive
Decoiler..........................................................To
load and uncoiling material
(We also have Electric Decoiler and Hydraulic Decoiler to hold the
heavy material.)
B. Servo Feeding
Applicator............................................To feed the
material accurately
C. Hydraulic/Press
Punching...........................................To punch as
requirements
D. Roll Forming
Unit.........................................................To
roll form as requirements
E. Hydraulic
Cutting.........................................................To
cut sheets as desired length
(We also have non-stop hydraulic cutting system.)
F. Output
Table................................................................Support
the finished products
Decoiler—feeding with guide—Rollforming——Cutting—Products collecting
Machine Components
3T passive de-coiler | 1 set |
Main roll forming machine | 1 set |
PLC Control box | 1 unit |
Hydraulic station | 1 unit |
Out table | 2 units |
Following cutting | 1 unit |
Safety cover | 1 unit |
Machine Photo
Loading Pics
After-sale Serive
- The seller take responsibility to installation and commissioning
of the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)