Gear Box Transmission Guardrail Roll Forming Machine Punching Press Automatic cutting

Brand Name:Sussman
Certification:CCC, SGS, ISO9001, CE
Model Number:SM-GRW
Minimum Order Quantity:1 set
Delivery Time:75days
Payment Terms:L/C, T/T,
Contact Now

Add to Cart

Verified Supplier
Location: Wuxi Jiangsu China
Address: NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

Gear Box Transmission Steel Two Waves Guardrail Making Machine Punching Press Machine Automatic cutting ​


Technical Parameter


Item

Specification

Steel Sheet Thickness

2-4mm (depend on requirement )

Hydraulic power

7.5Kw

Transmission way

gear box

Material of blad

Cr12, quenching treatment

Capacity of Decoiler

5 Ton hydraulic decoiler

Forming Speed

5-20m/min(not including punching time)

Roller Groups

about 13 stations main roller

Roller Material

GCr15, quenching treatment

Roller Diameter

180mm

Principal Axis

45# high grade steel with quenching treatment

Main Motor Power

22 Kw


Main Components


1. 5 ton hydraulic decoiler-------------------------------- 1Set

2. Leveling device------------------------------------------ 1Set

3. Punching machine-------------------------------------- 1Set

5. Main roll forming machine---------------------------- 1Set

6. Hydraulic station----------------------------------------- 1Set

7 Cutting device-------------------------------------------- 1Set

8 Finished products tabel--------------------------------- 2Set

9 PLC control system-------------------------------------- 1Set

7. Spare parts------------------------------------------------ 1Set

8. Gear box---------------------------------------------------- 1Set


Applications


Highway Guard Rail


Working Flow


Decoiler ---- Feeding --- Levelling---Punching--- Roll Forming ---- Cutting ---- Run out table


Profiles Of Rack Shelf



Advantage for Roll Forming Machine

1). Reasonable Price
2). High Quality
3). 12 Months Warranty
4). More Than 10 Years Experience
5). Durable
6). Reliable


After-sale Serive

- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.
-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)


Machine Photo



China Gear Box Transmission Guardrail Roll Forming Machine Punching Press Automatic cutting supplier

Gear Box Transmission Guardrail Roll Forming Machine Punching Press Automatic cutting

Inquiry Cart 0