70FT Direct Burial 2000kg Galvanized Steel Pole NGCP Standard Electric Column

Brand Name:milkyway
Certification:ISO9001:2015
Model Number:90FT 5mm
Minimum Order Quantity:one container
Delivery Time:always 2 weeks
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Address: No.1 Yinhe road, Wanshi town, Yixing, Jiangsu,China 
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

70FT Direct Burial 2000kg Philippines NGCP Standard Electric Column


Description

MaterialQ345
Height70FT
Shape16sides
BracketsDouble brackets in the shape as customer's request
Base plateDirect Burial
LengthWithin 14m once forming without slip joint
Wall thickness4mm/5mm
GalvanizingHot dip galvanization with thickness of 80-100µm average

Production Progress


Raw material test → Cutting →Molding or bending →Welidng (longitudinal )→Dimension verify →Flange welding →Hole drilling →Calibration → Deburr→Galvanization or powder coating ,painting →Recalibration →Thread →Package


Advantage

OEM&ODM service available

Great anti-corrosion performance

Long life time: 25 years long life span

BAOSTEEL Q235 steel, high strength and great resilience

Dual protection treatments: hot galvanized first and then powder paint

Multiple painting colors available: Default color Gray. Custom available

Dismountable arms and foundation kit: Only a screwdriver, requiring no welding



Company Introduction


Jiangsu Milky Way Steel Poles which established on 1991 is located in Wuxi,East of China ,near one of the largest sea port of China ,Shanghai,Port .
Our Company has 24 years experience on producing the steel poles including the transmission power pole,street light pole,high mast pole and so on.
We exported to oversea countries since 1991 and our products have been delivered to more than 70 countries and areas ,including America,Australia ,Russia ,Germany ,Span,Philippines ,Malaysia,Africa and so on.
We are the supplier of many big project in many countries,like the street light pole of Dubai Tower.the high mast pole for Sochi Winter Olympic Game and so on.


Installation


1. Remove all the equipment on the pole during Assembly.
2. Circle a sling around th epole shaft of each section.
3. Fix the sling on top section to one pulley block.
4. The sling on the bottom section is tightly fixed and fixed at the center of gravity.
5. Make the steel pole vertical by tighten the sling of the top section.
6. Fix the steel pole.
7. Remove the sling.


Our steel pole, steel poles , steel power poles ,power steel poles, electrical poles, electrical power poles, power poles, power distribution equipment poles , electric power transimission &distribution steel poles ,hot-dip-galvanized steel poles ,lamp poles ,road poles, streeting lighting poles, street lamp poles ,solar street lamps steel poles ,high mast lamp poles,road lamp poles, the steel street lamp poles, hot-dip-galvanized steel lighting ,outdoor lighting ,outdoor lamps ,street lighting poles ,steel post ,street poles, lamp parts ,lighting fixture ,lighting poles ,lighting equipment ,lighting decoration ,lighting product , street lighting body, high mast lighting steel poles &tower,electric poles, round&square street lighting steel poles with double arm or single arm . Stainless steel poles, Flag mast stainless steel pole, aluminum street light poles, traffic lighting steel poles, telecom tower poles , baseplate , bearing plate, base flanges , are made by hot-roll steel coil ,the process as cut plate, bending ,forming,automatic welding,drill holes ,quality check before galvanized, hot dip galvanized or powder coating , final quality check according by client required.

China 70FT Direct Burial 2000kg Galvanized Steel Pole NGCP Standard Electric Column supplier

70FT Direct Burial 2000kg Galvanized Steel Pole NGCP Standard Electric Column

Inquiry Cart 0