UL DLC Samsung2835 5000K LED Post Top Retrofit For Parking Lot

Brand Name:Romanso
Certification:DLC/UL/CUL/CE/ROHS/LM79/LM80
Model Number:RMS-360D-S-K8-75W-ID
Minimum Order Quantity:1 PIECES
Delivery Time:5 working days for samples
Payment Terms:Western Union, L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Shenzhen Guangdong China
Address: Baoshi Science and Technology Park,Baoshi Road,Shiyan Town,Baoan District,Shenzhen,China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

UL DLC Samsung2835 5000K LED Post Top Retrofit For Parking Lot


Quick Detail:

  1. LED Base: E26/E27/E39/E40
  2. LED Power: 75W
  3. Warranty: 5 years
  4. Certificates: DLC, UL, CE, ROHS, LM79, LM80, IES

Product Features:


1. Fast turn on, no warm-up or cold start problems, anti-seismic, shock resistance, no radiation .

2. 80% more energy saving compared with conventional street light, CFL, Incandescent light.

3. Gorgeous design, beam Angle: 360°.

4. Lifespan: >50, 000 hours.

5. Replacement: HID/ HPS/ Sodium/ CFL/ Mercury.

6. Solve 4 difficulties for LED packaging, heat sinking, operational lifespan, luminous efficiency.


Specifications:


Model No.RMS-360D-S-K8-75W-IDLED BrandSamsung 2835smd
SizeΦ95×306MMLumen7875LM
MaterialAluminium PCB and heat sinkCCT2700-6000K
LED Q'ty252pcsSoketE26/E27 E39/E40
Power75WIP RatingIP65
VoltageAC100-300V 50/60HzReplaced250W CFL HPS etc

Color selection:


Installation:



Applications:


Home, School, Hospital, Shopping mall, Supermarket, Factory, Workshop, Parking lot, Subway etc



High Service Quality:


We believe that customer service is our most important product, and consistently try to exceed clients' expectations. We understand the needs of market and are always in a position to provide buyers with the latest products for their different regions.


FAQ:


1). Q: Can I have a sample order?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.


2). Q: What is the lead time?
A: Samples need 3-5 working days, mass products need 7-10 days.


3). Q: How do you ship the goods and how long does it take arrive?
A: Express(DHL,UPS,Fedex or TNT.), Air or Sea shipment is available depends on your need. It usually takes 3-5 days to arrive except Sea transportation.


4). Q: How to precede the order if I have logo to print?
A: Firstly, we will prepare artwork for visual confirmation, and next we will produce a real sample for your second confirmation. If mockup is ok, finally we will go to mass production.


5). Q: How to deal with the faulty?
A: Firstly, our defective rate is less than 0.2%, so there is no big problem to the lights. Secondly, we usually offer 5 years warranty for our lights. Thirdly, during the guarantee period, we will resend new lights with the new order for small quantity. If there are many lights don't work, we can repair them, then resend them to you.


Should you have any question about our products, please
feel free to contact us.

We are glad to provide more details for your reference.




China UL DLC Samsung2835 5000K LED Post Top Retrofit For Parking Lot supplier

UL DLC Samsung2835 5000K LED Post Top Retrofit For Parking Lot

Inquiry Cart 0