Steel Structure Cold Roll Forming Machine Metal Deck Walk Scaffolding Steel Profile

Brand Name:Shenghong
Certification:CE/ISO
Model Number:SH16-06-05-19
Minimum Order Quantity:1 sets
Delivery Time:40 days after payment
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Address: No. 1, Xingyuan Road, Gu Shan Town, Jiangyin city, Jiangsu Province, China
Supplier`s last login times: within 24 hours
Product Details Company Profile
Product Details

Steel Structure Cold Roll Forming Machine Metal Deck Walk Scaffolding Steel Profile

Product Description:

Process Flow:

De-coiling → feedinig → forming → punching cutting → product

Machine components:

De-coiler------------------------------------------1set


Forming machine--------------------------------1set


Cutting device -----------------------------------1set


PLC control box --------------------------------1set


Hydraulic pump station-------------------------1set


Production support table-----------------------1set

A Decoilr

1Load Capacity5T
2Coil Inner-Diameter≤508mm
3Coil Outer-Diameter

≤3000mm

B Roll forming machine

1Feeding material1000mm
2Effecvtive material688mm
3Material thickness1-3mm
4Forming Steps30-steps
5Line Speed8 to 15m/min
6StandIndependent stand structure (raft structure)
7DriveIndependent motor and moved by chain
8Material of Roller40Cr, HRC45-55
9Shaft Diameter100mm
10Main Motor PowerAbout 80KW
11Shaft of material45#steel after treatment
12Voltage

380V/50HZ/Three Phase

C Cutting device

1Cutting DieCr12, HRC58-62
2Tolerance±2mm
3Valve

Adopts Italy Atos

D Control system

1TypePLC Frequency Control System with touch screen
2PLC BrandJapan Panasonic
3Encoder BrandMain Application: Floor decking
4TransducerPanasonic
5Length Error

±2mm


E Output table

1FunctionIt is simple and used to load finished product.
2Length

6m

AFTER SALE SERVICE


- The seller take responsibility to installation and commissioning of the equipment and free training. After machine arrive the destination, by the request of the buyer , the seller will provide 1 technical engineer to guide installation and training , and the buyer should give the technical person with full cooperated.

- Installation period: about 5 days after the complete preparation by the buyer such as the foundation and all necessary accessories.

- Training time: 5 days.

- Before departure of the engineers from seller, the buyer should pay for installation and commissioning fee 100$/day to the point account of the seller. The two-way ticket,visa, food, hotel , the translator and insurance are all should provide by buyer with full responsibility.

-The seller supply technical data (including forming mould drawing, electrical elements drawing and equipment drawing etc.)


Advantages

1.We are factory and located in Shanghai,China,offer best quality machines


2. Customers Design ,Size,Color&Logo are accepted.


3. With20 years professional manufacture experience


4. Prompt Delivery&Competitive Price


5. Main markets:Middle East, Europe, North America, Africa,Southeast Asia.

China Steel Structure Cold Roll Forming Machine Metal Deck Walk Scaffolding Steel Profile supplier

Steel Structure Cold Roll Forming Machine Metal Deck Walk Scaffolding Steel Profile

Inquiry Cart 0