10m/Min 2 Waves Highway Guardrail Roll Forming Machine

Brand Name:DINGBO
Certification:CE ISO
Model Number:DBHG
Minimum Order Quantity:1 set
Delivery Time:Shipped in 30-70 days after payment
Payment Terms:L/C, Western Union,
Contact Now

Add to Cart

Active Member
Address: No. 1, Xingyuan Road, Gu Shan Town, Jiangyin city, Jiangsu Province, China
Supplier`s last login times: within 24 hours
Product Details Company Profile
Product Details

Gearbox Transmission Two Waves Guardrail Roll Forming Machine Automatic Highway Guardrail Forming Machine


Product Descriptions

Three waves highway guardrail machine can produce both 2 waves and 3 waves guardrail without changing. Guardrails are widely used for highway and road and bridges.
The highway guardrail is the main form of the semi-steel guardrail, which is a continuous structure supported by the main column with corrugated steel guardrails.
Collision of its vehicles, because the corrugated steel guardrail plate collision resistance and energy absorption effect, is neither easy to crashed again at the same time for personnel, vehicles and passengers have very good protection effect.

Two waves highway guardrail machine can produce 2 waves guard rail which used for highway safety.
Antisepsis, anti - aging, anti - sun, high - resistance, low temperature and other characteristics, outdoor environment can be used for 10-25 years.
Product structure succinct, beautiful and practical, easy to transport, installation, good anti-theft performance, restricted by the terrain is small, for mountain, slope, bending area adaptability strong, moderate cost, suitable for large area USES.


Product Parameters


ItemsSpecifications
Max Material Thickness2-4.0mm
Hydraulic Uncoiler5T
Leveler7Rollers
Hydraulic Power15w
PunchingHydraulic pre-punching
Mould MaterialCr12Mov
Rolling Speed10m/min
Roller Stations13 stations
Roller MaterialGcr15, quench treatment hardness 55-60
Shaft45#steel
Shaft diameter95mm
Main Motor Power55 kw
Side structureMemory archway
TransmissionGearbox
Hydraulic Power15 kw
Blade MaterialCr12Mov
Tolerance+-1.5mm
Electric Source

380V, 50HZ,3 phase(customized)

PLC Control SystemPanasonic


Version to design



Working Flow



Main Components


No.NameQty
1Hydraulic uncoiler1
2Leveling1
3Hydraulic Punching1
4Main Roll Forming Machine1
5PLC Control Box1
6Hydraulic Pump Station1
7Output Table2



Application Pictures


Highway guardrails provide a visual and physical barrier between traffic and work areas. It is used for protection against accidents due to lift trucks or other mobile equipment in dock areas, aisles, around special equipment, . Reduce costly damage to equipment and inventory. Modular system is easily expanded or moved as needed. For indoor or outdoor use.

Highway Guard rail or guardrail, sometimes referred to as guide rail or railing, is a system designed to keep people or vehicles from (in most cases unintentionally) straying into dangerous or off-limits areas. A handrail is less restrictive than a guard rail and provides both support and the protective limitation of a boundary.


FAQ


1. Q: What's the warranty period? (24hours online)
12 months warranty period, starting from the date of the successful installation and commissioning of the equipment at the Buyer’s Installation site. During which all parts damaged because of quality problem will be changed for free.
2. Q: Do you have installation and commissioning service
A.If buyers come to our factory to inspect, the training to install and operate is provided face to face. If not, manual and video is provided to show how to install and operate.

B. If buyer need we will send technician to buyer site to do installation and commissioning and training.

C.installation and commissioning cost: One engineer will visit Buyer’s workshop for installing, commission and training. The buyer has to pay USD100/per day and visa fee, air tickets fee, accommodation and food, necessary communication, etc.

(Normally ,It takes about a week to install )

3. Q: What’s your after-sales service ?

We provide 24-hour online service for our customers.

And we are happy to give advice and also have skilled technicians available to maintain the machine overseas to customers’ workshop if needed.

4. Q: What's your delivery time ?

Normally we can finish production and testing within 45-70 days after receiving deposit. Some machines in stock, can be delivered at any time

5. Q: You are trading company or factory?

We are Manufacturer, and we export our machine by ourselves.

6. Q: Do you provide customized machine?

Sure, we can design the machine according to the requirement and profile drawing you provide. Our engineers can offer the best professional solution to our worldwide clients.

7. Q: How to place order ?

Inquiry---confirm the profile drawings and technical specification and price----confirm the PI---arrange the deposit or L/C---start production-- do inspection--- Shipment

8.What are your terms of payment ?

First payment: 30 % by T/T, second payment: 70% by T/T, after the successful inspection at seller’s workshop, and before delivery.

China 10m/Min 2 Waves Highway  Guardrail Roll Forming Machine supplier

10m/Min 2 Waves Highway Guardrail Roll Forming Machine

Inquiry Cart 0