Add to Cart
Puffed rice candy cake production line/ popcorn ball forming machine
Introduction
This line is made up of heat preservation blender, pressing
presser, length cutting machine, breadth cutting machine. The
exterior of the machine is made with type 304 stainless steel; it
is suitable for automatic forming for swelled candy rice, sachima,
nut crisp, etc.
Technical Parameters
Output | Installed Capacity | Voltage / Frequency | Dimension | Workers Required |
300-400kg/hr | 9kw | 380V 50Hz | 8 x 4 x 2m | 2-3workers |
New Advantages
1-Auto mixing & materials pouring system, materials pouring mouth and feeding can perfect match, and the equipment is more automatic, production is more continuous, capacity is more increased.
2-Forming conveyor belt is lengthened, cooling fans are increased to six pcs, the products can have better cooling effect and also will have better cutting forming effect.
3-The place where lengthways cutter and conveyor belt touch, through special processing, the products will be cutted totally, won’t have phenomenon of adhesion.
4-Crosswise cutter is changed to continuous cutting from before pausal cutting, the production will increase by 40%.
5-Beneath lengthways cutter’s conveyor belt, to install waste materials scraper blade, in order to clean the waste materials which stick on conveyor belt, and the waste materials will be collected by under tray, easy to clear.
Our service
1. We make accurate factory layout design according to customer’s
factory size; if the customer needed, we could make workshop design
with electricity power, water supply, gas power, material storage,
final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply
for the Visa to client’s country immediately; normally the vessel
needs 20-60 days to the required port, so we have enough time to
get the Visa. While the machines arrives your factory, our
engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and
adjust the processing line to realize normal production at shortest
time.
4. Our engineers have responsibility to train and teach the workers
how to operate, clean, maintain and repair all the machines, until
the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we
supply 1 year guarantee from the date of completion of
commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and
daily salary USD 100 are on client’s account.
Samples
Fairs :