

Add to Cart
Transmission Line Stringing Tools Professional Vertical Take Off And Landing Drone For Power Line
Drone for power line project
It has two type, Easy to carry around.
The battery warranty lasts for 3 months, the motor warranty lasts for 6 months, the ESC warranty lasts for 6 months, and the unmanned aerial vehicle warranty lasts for one year if no artificial damage is caused to other electronic products.
Type | 8 rotors | QTy |
Body material | Full carbon fiber | 4 |
Brushless motor | 8 | |
Flight control+GPS | DJ-V2 | 1 |
HD camera | 1 | |
Image transmitter | 5.8 | 1 |
Remote control | TIANDIFEI AT9 | 1 |
Ground display | 1 | |
OSD | 1 | |
PACKAGE | 1 | |
Charger | 1 | |
Dispenser | 1 | |
Display battery | 11.1V 2200mA | 1 |
Take-off and landing mode | Vertical take off and landing | |
Remote control, remote sensing range | ≤1.5km | |
Standard flight weight | 8kg | |
Effective load weight | 5kg | |
Battery type | Lithium battery 22V 16000mA | 2 |
Load flight time | About 15-20 minutes | |
Max flight speed | 14m/s | |
Relative flying height | 0-2000m, as per country's limited flying height | |
Flying speed | 0-15m/s (0-54km/h) | |
Flight navigation control accuracy | Vertical 0.5m, parallel 1m | |
Working temperature | -40°C-60°C |
Application
1.The trees in the virgin forests often encounter bushes, virgin
forests, etc. during the construction of the national grid. This
will definitely affect the progress of the construction. When
passing through the virgin forest, the trees cannot be felled. This
undoubtedly adds a lot of difficulty to the construction of the
project, and with the lined drone, it is easy to fly over the trees
and cast a guide rope to the ground.
2.In the traditional wire-laying operation on the Yangtze River,
the tow rope can only be towed by the tugboat over the water
surface. The construction water surface must be sealed first. The
closure of the navigation will also cause many economic losses to
the country and the construction party. The personnel stood on the
ship and remotely dragged the helicopter of the guide rope so that
the guide rope could fly over the Yangtze River and avoid sealing.
3.In the construction will also encounter swamps, lakes, farmland,
highways, mountains, etc., when people are unable to achieve the
construction of the line, the line of drones also show their
talents, complete the task.
4.The situation of charging across the power usually exists in the process of circuit reconstruction. It is necessary to straddle a new line on the basis of a power-on line. In order to ensure the safety of construction workers, traditional construction can only be used first. After the line is powered off and then constructed, the overhead drone can be used to avoid power outages.