Home /

PVC Cable Pipe Shrink Wrapping Machine Pipe Stranding Production Line

PVC Cable Pipe Shrink Wrapping Machine Pipe Stranding Production Line

Brand Name:Xingyu
Certification:ISO9001-2000
Model Number:G800
Minimum Order Quantity:1
Delivery Time:60days
Payment Terms:30%advanced payment by TT,70% before shipment
Contact Now

Add to Cart

Verified Supplier
Address: Lingjiang Green Industrial Park Zhangjiagang, Jiangsu, China
Supplier`s last login times: within 48 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Pipe Stranding Production Line Pvc Cable Pipe Machine


plastic pipe extrusion line used for water supply,gas supply,coal mine,solar energy,floor heating ,communication area and so on. The production line consists of new generation High efficiency single screw extruder(38:1), pipe mould, vacuum calibration tank, spraying cooling tank,haul-off unit, cutter stacker, etc. single screw extruder and haul-off unit adopts imported AC inverter, both electrical components and driving motor use the quality brand.

Quick Detail:

1. Type: pipe-shrinking machine

2. Model Number: G800

3. Used in: G800 pipe-shrinking machine is for making pipe before drawing machine,the material can be any metal.G400 pipe-shrinking machinecan roll pipe diameter of 16--40mm to 10--35mm.


Operating Instructions:

No.

Name

Technical Parameters

Unit

1

Range of Reduction
for Diameter

10 ~ 35

mm

2

Diameter of Mother Tube

16 ~ 40

mm

3

Time for
one reduction

4 ~ 6

s

4

Motor

11

kw

5

System pressure

52

Mpa

6

Machine Size

900*1150*1310

mm

7

Machine weight

1750

kg


G400 pipe-shrinking machine operations and processes


1. Take out the mould by rotating it according to arrow direction, no reverse rotation allowed.

2. Moulds can be changed according to different specifications.

3. Head length can be adjusted by middle adjusting rod, loose the belt wheel screw, adjust the length and fasted the screw again.

4. Pour in 80% diesel and 20% engine oil, as the oil pump capacity is big, oil box entrance valve should be fully open, machine valve fix a little oil is ok.

5. After the umbrella-block wear down and the gap becomes big, you can put a gasket between umbrella block and the mould, but the gasket can not be too thick so that machine won't get stuck.

6. The lubrication oil should be changed after it gets dirty.


Safety Precautions


1, Place the machine on a fixed horizontal surface and the calibration level, the machine is stable.

2, Check the oil level before use, to keep the hydraulic oil target position in 1/2 or more.

3, Check the motor rotation, such as rotation error, please adjust the power wiring.

4, When the state machine automatically, please confirm the accuracy of the input data.

5, When the machine is operating, safety, the hands, the body, such as near the action area is prohibited.

6, People must be dedicated machine operation, and the operator should be able to reach and stand within the scope of the emergency stop bu tton.

7, Machine must be grounded.

8, When remove mold, must turn off the power.

9, Please refuel oil regularly.

10, Keep the machine and the environment clean.

11, Not allowed to work in the dust, conductive particles and acids and other places.


Factory picture:


Part of the machine:

China PVC Cable Pipe Shrink Wrapping Machine Pipe Stranding Production Line supplier

PVC Cable Pipe Shrink Wrapping Machine Pipe Stranding Production Line

Inquiry Cart 0