Home /Holiday Lighting /

150w 300w High Power Led Street Light Housing Four Installation Brackets

150w 300w High Power Led Street Light Housing Four Installation Brackets

Brand Name:DIE CASTING MAN
Certification:CE.ROHS
Model Number:ZHSL-17A/B/C/D-150;ZHSL-17A/B/C/D-300
Minimum Order Quantity:100PCS
Delivery Time:15-35DAYS ACCORDING TO THE ORDER QUANTITY
Place of Origin:NINGBO CHINA
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: No.225, Tanshu Rd, Ninghai, Ningbo, Zhejiang, China
Supplier`s last login times: within 15 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

ZHSL-17


Module lens design makes the lamp with

well suited lighting. distribution for LED

parking lot light. 4 kinds of installation brackets,

installation angle -20~ +20/-128~+128

is adjustable, Good-looking

Product Description


This series is a high-performance street lighting available in two sizes.

The luminaire is manufactured from high pressure die-casting aluminum.

It shall have a led efficacy up to 120 lm/w and will be capable of producing

up to 36000 luminaire lumens at 4000K finished in Grey or black as standard.

CodeZHSL-17A-150ZHSL-17B-150ZHSL-17D-150ZHSL-17A-300ZHSL-17B-300ZHSL-17D-300
L1625683627725783727
L2483483483583583583
W305305305355355355
H727272727272

Multiple choices to meet your different needs


FAQ


Q1. What is your terms of payment?
A:Usually,we accept T/T,irrevocable L/C at sight.For regular orders,we prefer 30% in advance,70% against the of B/L.For long term business relations, we have more advantage terms for payment.

Q2. What is your terms of delivery?
A: We accept FOB,CIF,etc. You can choose the one which is the most convenient or cost effective for you.

Q3: What is the lead time?
A:It usually takes 25 to 35 days after sample confirmation and receiving your advance payment. The specific delivery time depends on the items and the quantity of your order. If the item was non standard, we have to consider extra 10-15days for tooling/mould made.

Q4: How about tooling Charge?
A: Tooling charge only charge once when first order, all future orders would not charge again even tooling repair or under maintance.

Q5. What is your sample policy?
A: We are glad to send ip65 led light samples for your inspection.Standard samples can be free, but the clients need to cover the freight cost.

Q6. Can you produce according to the samples or drawings?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q7: How to confirm the quality with us before starting to produce?
1) We can provide ip65 led light samples and you can choose one or more, and then we make the quality according to that. 2) Send us your samples, and we will make it according to your quality.

Q8: How to solve the quality problems after sales?
A: Take photos of the problems and send to us. We will make a satisfied solution for you within three days after we confirm the problems.

Q9. What is your terms of packing?
A: Generally, we pack our goods in neutral cartons. If you have legally registered patent, we can pack the goods by your logo after getting your authorization letters.

Q10. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery. We have QC team comply with TQM,each step is in compliance tothe standards.


China 150w 300w High Power Led Street Light Housing Four Installation Brackets supplier

150w 300w High Power Led Street Light Housing Four Installation Brackets

Inquiry Cart 0