AS/NZS/USA Prefab Villa Light Steel House Earthquake Proof With Natural Lighting

Brand Name:DEEPBLUE
Certification:AS/NZS,UL,AISI,
Model Number:DPBL-144#
Minimum Order Quantity:1SET
Delivery Time:30-45days
Payment Terms:TT,LC, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: No.69,LinChun Road,Yinzhou Binhai Industrial zone,YinZhou,Ningbo,China
Supplier`s last login times: within 29 hours
Product Details Company Profile
Product Details

AS/NZS/USA Prefab Villa Light Steel House Earthquake Proof With Natural Lighting

Giorgetti House
3 bedrooms 3.5 bathrooms 1 car spaces 263


The Giorgetti House is the perfect house design, big on space even when placed on a 'not so big' block. With a range of upstairs floor plans, this home will cater to your needs, whether you want a hotel-style master suite to chill out in or an extra bedroom to give your family room to grow.

  • Flexible floor plans with multiple layout options to suit your family
  • Multiple living and entertaining areas on the second floor, so that everyone has space to do their own thing.


Floor plan

  • The ground floor offers a complete lounge area, kitchen, dining room, living room, and a small bedroom for a short break.
  • There is a small garage on the ground floor.
  • The first floor consists of 2 bedroom, 1bathroom, 1 study, 1 living room with a balcony.

Quick Detail:


Nameprefabricated villaApplicationVilla for living
ColorwhiteFeature

1. quickly to assemble on site;

2. good earthquake proof;

3. green,and energy save;

Materiallight steel and other parts materialCertificateCE,ISO,SAA,ETC


Description:


Main structure: Light Gauge Steel

Wall material: ALC panel/fibre cement cladding+MGO board/gypsum board

Insulation material: Insulation material

Ceiling material: MGO board/gypsum board

Floor/foundation material: laminate flooring/wooden/PVC carpet

Door: steel security door/WPC or plywood door

Window: aluminum alloy/PVC

Roofing: EPS sandwich panel/steel roofing/asphalt shingle

Other fittings: toilet,washbasin,shower,kitchen etc.

Life time: 100 years for structure


How to get a turnkey house within 90 days?

A standard turnkey house is built in 90 days

The speed of erection is one of the main advantages of a steel-frame house. You can erect a fully completed standard house in 90 days. If the design of house is simpler, and installation workers are skilled in construction, the time will be much shorter, even can within one month or less.


1. Stage one: flight of fantasy

At this stage, clients work with local architecture to drawing their dream house. Then pass it to Deepblue, we will convert it to steel frame method of construction. At this stage, the advance payment or design fee is paid. Of course, you can also work with us for architecture drawing.


2. Stage two: Engineering drawing and report

Deepblue has own engineer team to help you do engineering drawing and report, and then client pass to local engineer and get approved


3. Stage three: Final quotation and material selection

Clients can choose whatever materials you like for your house. The final quotation will be confirmed according to final structure drawing and materials selections.


4. Stage four: Manufacture and Procurement

Normally, the leading time is 30-45 days for a full package of house. Meanwhile, the client will prepare the foundation.


5. Stage five: Delivery

We will inform client before finishing manufacture, and book shipment for you. At this stage, balance is paid.


6. Stage six: Installation

Deepblue will supply detailed installation manual. And client find local installation team to assemble, normally, 3-4 days can finish steel structure.


7. Stage seven: Construction

Client will work with local builder to construct. The house itself is assembled on the finished steel frame. This includes the assembly of roofing and wall, roofing, installation of wiring and water pipes.


  • Stage eight: Finishing

This is the final stage, which begins with the exterior decoration of the house and ends with the basic interior decoration - installation of lining or plasterboard, plastering, puttying and painting the walls, as well as additional finishing by customer's request (like installing doors or parquet).


Total duration of the construction of a turnkey steel-frame house with 100 square meters of internal space and with a basic interior finishing does not exceed 90 days.


ISO standard light gauge steel for main structure.fireproof,heat insulation,wind and earthquake resistance.green,energy save. also economically.


Why Choose Light Gauge Steel Structure?


1) Lifetime for structure: 100 years.[0.75~1.2mm , Z275galvanized steel profile, strength:550Mpa ]

2) Earthquake resistance: mix more than 8 grades.

3) Wind resistance:max 60m/s.

4) Fire resistance:all the materials used can be fire resistance.

5) Snow resistance:max 2.9KN/m²as required

6) Heat insulation:100 mm in thickness can match 1 m thickness of brick wall.

7) High acoustic insulation:60db of exterior wall 40db of interior wall

8) Insect prevention: Free from the damages by insects, such as white ants

9) Ventilation:a combination of natural ventilation or air supply keep the indoor air fresh and clean

10) Packing and delivery: 140SQM/ 40'HQ container for structure only and 90SQM/ 40'HQ container for structure with decorate materials.

11) Installation:the average is one worker one day install one SQM.

12) Installation guide:dispatch engineer to guide on site.


Production in DeepBlue factory:



How To Assemble:



Technology Details:



If You Need: prefabricated kit home; prefab kit home.steel structure homes.steel frame house


Only Need You To Provide Us:house area,how many floor and bedrooms,luxury or normally,or low cost configuation.


We Can Provide You:villa;bungalw;low cost house;granny flat;apartment etc.many buildings.

China AS/NZS/USA Prefab Villa Light Steel House Earthquake Proof With Natural Lighting supplier

AS/NZS/USA Prefab Villa Light Steel House Earthquake Proof With Natural Lighting

Inquiry Cart 0