​​TEMA Class R Exchanger: Carbon Steel Seamless Tubes Bundle, 1.5×Hydrotest per ASME Sec VIII

Brand Name:YUHONG
Certification:ASME, ASTM, ASME U Stamp
Model Number:CARBON STEEL TUBE BUNDLE
Minimum Order Quantity:1 SET
Delivery Time:30-60DAYS
Payment Terms:T/T, L/C, D/A
Contact Now

Add to Cart

Verified Supplier
Location: Ningbo Zhejiang China
Address: 20TH FLOOR,NO.1 NEW WORLD BUILDING ,NO.1018 MINAN ROAD,YINZHOU DISTRICT, NINGBO CITY, ZHEJIANG PROVINCE, CHINA
Supplier`s last login times: within 3 hours
Product Details Company Profile
Product Details

​​TEMA Class R Exchanger: Carbon Steel Seamless Tubes Bundle, 1.5×Hydrotest per ASME Sec VIII


TEMA Class R Carbon Steel Heat Exchanger meets stringent ASME Section VIII and TEMA standards which ensures safety, reliability, and long-term performance in demanding industrial environments.


1. Advantages of Carbon Steel Tube Bundles

FeatureBenefits
Cost-EffectiveReducing project costs.
High Mechanical StrengthSuitable for high-pressure applications.
Thermal ConductivityEfficient heat transfer properties.
WeldabilityEasier to fabricate and repair.
Corrosion Resistance (with HIC)Resist degradation in wet H₂S environments.
VersatilityIn oil & gas, petrochemical, and power generation.

2. ITP (Inspection and Test Plan) for Carbon Steel Tube Bundles

Step No.StageAcceptance CriteriaWitness/Review
1Raw Material InspectionASTM or ASME standardsQC, Third-Party Inspector
2Tube Dimensional CheckPer design drawings and tolerancesQC
3Tube Sheet InspectionAs per ASME Sec VIII requirementsQC
4Tube-to-Tube Sheet WeldingASME Sec IX standardsThird-Party Inspector
5Baffle and Support AssemblyTEMA Class R specificationsQC
6Hydrostatic TestingNo leakage or pressure dropAuthorized Inspector, Client
7Final InspectionTEMA standardsClient, Third-Party Inspector
8Documentation ApprovalComplete and accurate documentationClient, QC

3. Hydrostatic Testing Requirements and Procedure

Key Requirements:

  • Test Standard: ASME Section VIII Division 1.
  • Pressure: 1.5× design working pressure.
  • Hold Time: 2 hours usually we do.

Testing Procedure:

  1. Preparation:

    • Assemble the tube bundle and ensure all openings are sealed with appropriate caps or plugs.
  2. Pressurization:

    • Using a calibrated hydraulic pump, gradually increase pressure to the required test level (1.5× design pressure).
  3. Hold Period:

    • Inspect all welds, connections, and surfaces for visible leaks or deformation
  4. De-pressurization:

    • Slowly release the pressure after the test duration to avoid damage to the tube bundle.
  5. Post-Test Inspection:

    • Record test results and prepare a detailed hydrotest report for client approval

China ​​TEMA Class R Exchanger: Carbon Steel Seamless Tubes Bundle, 1.5×Hydrotest per ASME Sec VIII supplier

​​TEMA Class R Exchanger: Carbon Steel Seamless Tubes Bundle, 1.5×Hydrotest per ASME Sec VIII

Inquiry Cart 0