Flexibility 51m Large - Span Mechanized / Emergency Bridges / Single Suspension Bridge

Brand Name:Harzone
Minimum Order Quantity:negotiation
Delivery Time:negotiation
Payment Terms:According to detailed order
Place of Origin:China
Packaging Details:According to detailed order
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details


Flexibility 51m Large - Span Mechanized / Emergency Bridges / Single Suspension Bridge

Description:

51m Large-Span Mechanized Bridge is a set of mechanized bridge with large single span carried by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge quickly to ensure all sorts of vehicles to go across rapidly.

51m Large-Span Mechanized Bridge possesses the feature of good flexibility, big single span, simple structure, speedy erection, high mechanization and less manpower. Besides, it has the advantages of convenient transportation and favorable adaptability of bank.


Specification:

Curb weight of erection vehicle (including 3 men) 32.5t

Curb weight of transport vehicle 20.8t

Bridge bay weight: 9.2t

Design load: tracked load LD-60

Wheeled (load on axle) LT-20

Erection length 17m, 25.5m, 34 m, 42.5 m, 51 m

Erection width 4m

Erection time (complete bridge) 75min

Retrieval time (complete bridge) 75min

Operator 6~7 men (not including drivers of transport vehicles)


China Flexibility 51m Large - Span Mechanized / Emergency Bridges / Single Suspension Bridge supplier

Flexibility 51m Large - Span Mechanized / Emergency Bridges / Single Suspension Bridge

Inquiry Cart 0