Replacing Collapsed Bailey Bridge Between 3 Metres And 200 Metres Long Steel

Brand Name:Harzone
Certification:ISO9001:2015
Minimum Order Quantity:1set
Place of Origin:Hubei,China
Price:Negotiated
Supply Ability:50000 Ton/Tons per Year
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge

Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge Description:


  • replacing collapsed bridges (between 3-metres and 200-metres long)

  • restoring access to roads washed out in storms

  • providing cost-effective temporary structures for roading projects


Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge Specifications:


TypeCB100
Designed Span6-60m
Designed LoadHS25-44,Axle Load 20t,tracked load 50t
Panel Dimension1.448*3.048m
Carriageway Width4.2m/7.35m
Deck typesteel deck/ wood deck

Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge contains of girder, deck, frame connecting structure, bridge end structure and gateway structure. Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge girder is combined of panel, panel pin (include safety circlip) and chord reinforcement. CB 200 Metal Truss Bridge Compact Panel Bridge deck is combined of transom, Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge plate and kerb. Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge frame structure is combined of raker, bracing frame, vertical frame, sway brace and vertical component. Replacing Collapsed Bridges (Between 3-Metres And 200-Metres Long) Steel Bridge end section is combined of end post, lower bearing and frame plate. The gateway structure is combined of ramp, ramp bearing and end plate.



Harzone Industry was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four decades, the leaders of both the Party and nation have been caring for the growth of the company. Chairman Mao underlined the documents for the factory establishment. Later, ZhangAiping., one General, and Chen Shiju, one commander, inscribed name for the company. In 2008, Mr. He Guoqiang, Standing Committee of Political Bureau of CPC Central Committee, Secrrtary of the Discipline Inspection Commission of CPC Central Committee had paid a visit to the company and inspected the workshop and saw the erection of the mechanized bridge, who also encouraged the company to develope well.

China Replacing Collapsed Bailey Bridge Between 3 Metres And 200 Metres Long Steel supplier

Replacing Collapsed Bailey Bridge Between 3 Metres And 200 Metres Long Steel

Inquiry Cart 0