Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

Brand Name:Harzone
Minimum Order Quantity:negotiation
Delivery Time:negotiation
Payment Terms:According to detailed order
Place of Origin:China
Packaging Details:According to detailed order
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers is sort of emergency equipment carried by automobile and accomplishes erection and retrieval by erection vehicle.


Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers is mainly used to erect a bridge with a length of 21m long and a width of 3.3m to ensure all sorts of vehicles with a tracked load of up to 60 tons or an axle load of up to 17 tons to go across small medium rivers and dry gaps rapidly.


Pictures of Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers


FAQ

1,How about quality control of your company?

Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.


2,Are you a factory or a trade company?

We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.


3,Where is your loading port?

Shanghai Port,Nanjing Port,Tianjin Port.


Specifications of Less Operators: 2-3 Wheeled Load-13t Mechanized Bridge

Tracked load / axle load

60t / 13t

Outline dimension (L*W*H)

13*3.3*3.6m

Bridge length21m
Negotiating length (on hard banks)19m

Gross weight

32.5t

Bridge weight

10.5t

Section length

10.63m

Bridge width (when expanding)

3.3m

Track width

1.15m

Section height

0.95m

End section height

0.35m

Operator

2-3

Erection time

10 min

Max. longitudinal slope / lateral slope

±10% / ±5%

Allowable bank height difference

5%


China Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers supplier

Retrieval Time 10min Mechanized Bridge For Overcoming Small Medium Rivers

Inquiry Cart 0