Large Span Mechanized Bridge Fast Erection 90 Min 51m

Brand Name:Harzone
Minimum Order Quantity:negotiation
Delivery Time:negotiation
Payment Terms:According to detailed order
Place of Origin:China
Packaging Details:According to detailed order
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

Fast Erection 90min 51m Mechanized Bridge


Description of Dimension Of Fast Erection 90min 51m Mechanized Bridge :


Fast Erection 90min 51m Mechanized Bridge is a set of temporary large span bridge equipment carried by erection vehicle, accomplishing the erection and retrieval operation by the erection vehicle,which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.


Fast Erection 90min 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.


Main features of Dimension Of Erection Vehicle (L×W×H ) 13.6m×3.2m×3.47m Mechanized Bridge​:


1Excellent cross country performance: Cross country chassis (8×8 erection vehicle, 6×6 transportation vehicle)

2 Large single span: max. single span reaches 51m

3 Less composition unit: one erection vehicle, six transportation vehicle

4 Fast erection: 90min (To erect a 51m bridge)

5 High mechanization level, low labor intensity: using remote control operation

6 Less operators: 3-4(not including drivers)


NoItemData
1Curb weight of erection vehicle33t
2Curb weight of transportation vehicle21t
3Dimension of erection vehicle (L×W×H )13.6m×3.2m×3.47m
4Dimension of transportation vehicle (L×W×H )12m×3.4m×3.5m
5Load capacity
Tracked load60T
Wheeled load13T
6Life time10000 times
7Erection length17m,25.5m,34m,42.5m,51m
8Erection width4m
9Negotiating depth:±3m
10Erection maximum longitudinal gradient10%
11Erection maximum transverse gradient5%
12Erection time (complete bridge)90min
13Retrieval time (complete bridge)90min
14Operator(not including driver)3~4
15Ambient temperature-41℃~+50℃

Fast Erection 90min 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.

This is China Harzone Industry Corp.,Ltd., our company was founded in 1967,and we are a member of China State Shipbuilding Corpration Limited(CSSC),which is the largest central state-owned shipbuilding and military enterprise in China. As the pioneer in the research and manufacturing of emergency and rescue equipment in China, Harzone is the first company from the emergency industry listed in the stock exchange.


China Harzone dedicates itself to the following fields:

Design and manufacturing of military bridges and emergency rescue equipment

Design,manufacturing and installation of various kinds of steel bridges and steel structures

Research and re-fitting of special-purpose vehicles and equipment

Engineering contracting

Import and Export trading business


Harzone products have been exported to more than 40 countries and regions around the world and own a good reputation from international client.Moreover,China Harzone has been listed in the state emergency purchasing system and also the largest qualified rescue machinery supplier of the United Nations Emergency Procurement.


Please feel free to contact with us if you have any question.

China Large Span Mechanized Bridge Fast Erection 90 Min 51m supplier

Large Span Mechanized Bridge Fast Erection 90 Min 51m

Inquiry Cart 0