High Mechanization Level Temporary Bridge 51m

Brand Name:Harzone
Minimum Order Quantity:negotiation
Delivery Time:negotiation
Payment Terms:According to detailed order
Place of Origin:China
Packaging Details:According to detailed order
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

High Mechanization Level 51m Mechanized Bridge


Description of High Mechanization Level 51m Mechanized Bridge :

High Mechanization Level 51m Mechanized Bridge is a set of temporary large span bridge equipment carried by erection vehicle, accomplishing the erection and retrieval operation by the erection vehicle,which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.


High Mechanization Level 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.


High Mechanization Level 51m Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.


Main data of High Mechanization Level 51m Mechanized Bridge​​:


NoItemData
1Curb weight of erection vehicle33t
2Curb weight of transportation vehicle21t
3Load capacity
Tracked load60T
Wheeled load13T
4Life time10000 times
5Erection length17m,25.5m,34m,42.5m,51m
6Erection width4m
7Negotiating depth:±3m
8Erection maximum longitudinal gradient10%
9Erection maximum transverse gradient5%
10Erection time (complete bridge)90min
11Retrieval time (complete bridge)90min
12Operator(not including driver)3~4
13Ambient temperature-41℃~+50℃

High Mechanization Level 51m Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.

Harzone Industry was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four decades, the leaders of both the Party and nation have been caring for the growth of the company. Chairman Mao underlined the documents for the factory establishment. Later, ZhangAiping., one General, and Chen Shiju, one commander, inscribed name for the company. In 2008, Mr. He Guoqiang, Standing Committee of Political Bureau of CPC Central Committee, Secrrtary of the Discipline Inspection Commission of CPC Central Committee had paid a visit to the company and inspected the workshop and saw the erection of the mechanized bridge, who also encouraged the company to develope well.

China High Mechanization Level Temporary Bridge 51m supplier

High Mechanization Level Temporary Bridge 51m

Inquiry Cart 0