High Loading Capacity Fast Bridge Negotiating Depth ±3m Mechanized

Brand Name:Harzone
Minimum Order Quantity:negotiation
Delivery Time:negotiation
Payment Terms:According to detailed order
Place of Origin:China
Packaging Details:According to detailed order
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

Negotiating Depth ±3m Mechanized Bridge Fast Bridge


Description of Negotiating Depth ±3m Mechanized Bridge Fast Bridge​​:

Negotiating Depth ±3m Mechanized Bridge Fast Bridge is a set of mechanized bridge with long single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.


The whole set of Negotiating Depth ±3m Mechanized Bridge Fast Bridge is composed of three parts: bridge span, erection vehicle and transportation vehicle.


Main features of Negotiating Depth ±3m Mechanized Bridge Fast Bridge:

1 Fast erection: 90min (To erect a 51m bridge)

2 Excellent cross country performance: Cross country chassis (8×8 erection vehicle, 6×6 transportation vehicle)

3 Less operators: 3-4(not including drivers)

4 Large single span: max. single span reaches 51m

5 High mechanization level, low labor intensity: using remote control operation

6 Less composition unit: one erection vehicle, six transportation vehicle


Technical parameters of Heavy Loading Capacity Less Operators 3-4 Mechanized Bridge Fast Bridge:


NoItemData
1Curb weight of erection vehicle33t
2Curb weight of transportation vehicle21t
3Dimension of erection vehicle (L×W×H )13.6m×3.2m×3.47m
4Dimension of transportation vehicle (L×W×H )12m×3.4m×3.5m
5Load capacity
Tracked load60T
Wheeled load13T
6Life time10000 times
7Erection length17m,25.5m,34m,42.5m,51m
8Erection width4m
9Negotiating depth:±3m
10Erection maximum longitudinal gradient10%
11Erection maximum transverse gradient5%
12Erection time (complete bridge)90min
13Retrieval time (complete bridge)90min
14Operator(not including driver)3~4
15Ambient temperature-41℃~+50℃

Negotiating Depth ±3m Mechanized Bridge Fast Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.

FAQ

1,How about quality control of your company?

Manufacturing process for steel bailey bridge in China,who has engaging in this line for over 50 years with an International Quality System Certification of ISO 9001:2015 and as cooperation partner with the research institutions of the People’s Liberation Army. And our products have been exported to more than 40 countries and regions in Asia,Africa,Latin America and Oceania.


2,Are you a factory or a trade company?

We are a factory with 8 production lines and various machines to fabricate steel bridge parts,pontoon bridges,mechanized bridges and other products.Also, we have get the exporting license to devote ourselves into global market.


3,Where is your loading port?

Shanghai Port,Nanjing Port,Tianjin Port.


China High Loading Capacity Fast Bridge Negotiating Depth ±3m Mechanized supplier

High Loading Capacity Fast Bridge Negotiating Depth ±3m Mechanized

Inquiry Cart 0