Easy And Fast Erection Steel Bailey Bridge timber deck

Brand Name:Harzone
Model Number:CB100 TYPE, CB200 TYPE
Minimum Order Quantity:negotiation
Delivery Time:negotiation
Payment Terms:According to detailed order
Place of Origin:China
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No. 5, Yangguang Avenue, Miaoshan Development Zone, Jiangxia District, Wuhan City, Hubei Province
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

Easy and fast erection used steel bridgeSteel Bailey Bridge

Description of Easy and fast erection used steel bridgeSteel Bailey Bridge:

Easy and fast erection used steel bridgeSteel Bailey Bridge which are portable steel bridge have been generally used in several fields.

Easy and fast erection used steel bridgeSteel Bailey Bridge most important feature is to reach a variety of spans, bear carrying capacity, light and handy components, informal to dismantle and strong adaptability can be speedily completed with simple tools and manpower.

The apparent protection can be paint or hot-dip galvanized.



Specifications of Easy and fast erection used steel bridgeSteel Bailey Bridge:

Single lane:

Standard roadway: 3.15m / 4.2m

Single lane: 30ft-200ft

Double lane:

Standard roadway:7.35m

Double lane:30ft-180ft

Load: design according to different requirements

Deck: steel deck/timber deck

Bridge type: CB100, CB200

 


Advantage of Easy and fast erection used steel bridgeSteel Bailey Bridge

Possessing the features of modest structure,
suitable transport, quick erection
informal disassembling,
great loading capacity,
high stability and long fatigue life
being capable of an alternative span, loading capacity

Introduction of Easy and fast erection used steel bridgeSteel Bailey Bridge

Easy and fast erection used steel bridgeSteel Bailey Bridge is a typical bridge equipment, adopted broadly and the most general in the world


Mixture form to erect all kinds of

Provisional Bridges, Spare Bridges and Fixed Bridges.
Using the bridge equipment, the suspension bridges of diverse span can be erected.
The bridge has the advantages of few components, light weight and little cost.
Bailey Bridge requires no superior tools or heavy equipment for construction, the bridge elementsare small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.


Features of Surface Protection Hot-Dip Galvanized Bridge Bearing Pads Steel Bailey Bridge


1. great strength and big stiffness , relative to the concrete bridge can be reduced trabecular high and self-esteem
2. Because of the steel isotropic, quality of a material is unchanging and modulus of elasticity, that make steel bridge in the working condition and calculation compared with the assumption
3. Steel bridge usually USES factory, site splicing, the construction period is short, processing fitting and not affected by seasonal effect.
4. Steel bridge is suitable for industrialized manufacture and very suitable to transport.
5. Steel bridge is easy to repair and replace,long lifetime,material can be recycled.


Application of Surface Protection Hot-Dip Galvanized Bridge Bearing Pads Steel Bailey Bridge
Beam bridge,arch bridge,rigid frame bridge,cable-stayed bridge,suspension bridge. passenger foot-bridge

Competitive Advantage:

Heavy loading capacity
Great stability
Long fatigue life
Light weight
Low cost
Easy and fast erection

Harzone Industry was built in 1967, one of the subsidiary units of China State Shipbuilding Corporation Limited(CSSC), a state-owned and protected military company. Over the past four decades, the leaders of both the Party and nation have been caring for the growth of the company. Chairman Mao underlined the documents for the factory establishment. Later, ZhangAiping., one General, and Chen Shiju, one commander, inscribed name for the company. In 2008, Mr. He Guoqiang, Standing Committee of Political Bureau of CPC Central Committee, Secrrtary of the Discipline Inspection Commission of CPC Central Committee had paid a visit to the company and inspected the workshop and saw the erection of the mechanized bridge, who also encouraged the company to develope well.
Righe now, the company has one research center in Wuhan, which is the national degree, one trading center in Beijing, one manufactuing center in Chibi, three offices in Gana, Ethiopia and Peru.
Harzone Industry has enjoyed a proud history, it must also create a bridge future.

China Easy And Fast Erection Steel Bailey Bridge timber deck supplier

Easy And Fast Erection Steel Bailey Bridge timber deck

Inquiry Cart 0