Construction Modular Prefabricated Luxury House Flat Pack Container With Installation

Brand Name:Fesec
Certification:EN 1090-2-2018; ISO3834
Model Number:office booth
Minimum Order Quantity:10 set
Delivery Time:15-30 work days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Hangzhou Zhejiang China
Address: Huafeng Road 2#, Xiacheng District, Hangzhou City, Zhejiang China
Supplier`s last login times: within 25 hours
Product Details Company Profile
Product Details

House prefabricated luxury homes with installation

Assemble container house
BottomFrame structure2.5mm thick profiled steel
FloorMGO board, waterproof, fireproof
(Option Fiber cement)
Floor finishes1.8mm PVC flooring (extra cost)

Roof

Frame structure2.3mm thick profiled steel
Outside cover0.426mm steel sheet
Insulationglass wool
Ceiling0.25mm steel sheet bottom tile
ColorCustomizable
UseCarport, Hotel, House, Kiosk, Booth, Office, Sentry Box, Guard House,Shop,Toilet,Villa,Warehouse,Workshop,Plant
Cozener post4.5 cold rolled steel profile, galvanization, welded (160mm*160mm)
Wall panelSandwich panel with 50mm rock wool
WindowAluminum alloy windows with dimension 925mm*1200mm
(3mm single glass)
DoorSteel door with dimension 925mm*2035mm
Electricitylight, Switch, Socket, distribution box, breaker and wire
PaintingAutomatic galvanizing and baking paint spray molding

FAQ

1.Q: Could you please design a new and unique prefab house for me?
A: Absolutely! We are able to provide you with not only construction scheme, but landscape design! One-stop service is our outstanding superiority with no doubt.

2.Q: What should I provide to build a prefab house?
A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don't have any. Simply notify us your requirements, such as the area, usage and the stories of the house. Before long, you'll possess an amazing design.

3.Q: How could I ensure the cost of building a prefab house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

4.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3days finished installation, save manpower and time

China Construction Modular Prefabricated Luxury House Flat Pack Container With Installation supplier

Construction Modular Prefabricated Luxury House Flat Pack Container With Installation

Inquiry Cart 0