1 - 10 Results for test website load time from 75305 Products
Oltc High Quality Electrical Testing on Load Tap Changer Tester
...Testing on Load Tap Changer Tester Introduction: Oltc High-Quality Electrical Testing on Load Tap Changer Tester can record switch operation waveform in the overall process. The longest time is 6.4s. Oltc High-Quality Electrical Testing on Load Tap Changer Tester can test various parameters such as transition waveform, transition time, transition resistance, and three-phase synchronization one time......
RSBTC-IV Transformer Testing Equipment Load and No Load Power Analyzer
...Testing Equipment Load and No Load Power Analyzer (Table type) Product Description RSBTC-IV Power Analyzer is a high-accuracy instrument meticulously researched and developed by our company, exclusively for the measurement of transformer no-load and load parameters and zero-sequence impedance parameters. It can realize precise measurement to no-load current, no-load......
Wuhan Rising Electric Co., Ltd.
Verified Supplier
1st Floor, Block B, Innovation Park, Changzui Science and Technology Park, Sixth High-tech Road, Jiangxia District, Wuhan City, Hubei Province
ISO 8121-4 Electroplating Steel Toys Testing Equipment Loads For Stability Test
...load so that the height of its centre of gravity is (220 ± 10) mm above the seat surface. For toy scooters, however, use a test load with dimensions as specified in Figure 30. For all ride-on toys, secure the centre of gravity of the load both (43 ± 3)...
SKYLINE INSTRUMENTS CO.,LTD
Verified Supplier
No.1802 Room 6# Building Universal Commerce Center Nancheng District Dongguan Guangdong China
Water Absorption Machine for Ceramic Testing 2000N Load
....3-2016,ISO10545-3:1995 testing standard, Vacuum method is used to test the WA, apparent porosity and density of most of the ceramic materials. Degree of vacuum: ≥0.095Mpa Time for vacuuming: 0-99 min 59s Dipping time: 0-99hours59min Capacity: Φ250*......
Hai Da Labtester
Verified Supplier
Room 105, Building F4, District F, Tianan Digital City, Nancheng District, Dongguan City, Guangdong Province,China
IEC Test Equipment Load Box For Lab Equipment Testing IEC61058 / IEC606691
Load Box For Lab Equipment Testing Product overview: This load box is designed and manufactured according to IEC60884,IEC61058,IEC606691 standards and etc. It is used for the on-off ability test and the normal operation lifespan test of the Switches for household and similar fixed-electrical installations. Besides, it is also applied in the test......
150L Air Ventilation Aging Environmental Test Equipment With timing function
..., cloth, Equiped with a special ventilation regulator for maintain the fresh air inside when heating. This testing machine design with sophisticated air-displacement adjustment device and a digital voltage meter, current meter, watt-hours, the timer can...
Dongguan Liyi Environmental Technology Co., Ltd.
Verified Supplier
Building 74, 96 kechuang road, Lianke Innovation Center, Nancheng District, Dongguan, Guangdong, China.
100 Ton Force Test Wireless Load Cell Tension Links Dynamometer
...h application Environmentally sealed to IP67 or IP68 Can be used singularly or in sets Wireless Load Links Typical Specifications: Rate Load: 1/3/5/12/25/35/50/75/100/150/200/250/300/500T Battery Type: 18650 rechargeable ......
Xian Ruijia Measurement Instruments Co., Ltd.
Verified Supplier
No.81, Jinye 1st Road, High-tech zone, Xi’an, Shaanxi, China
GB/T 24248.4 ISO 9073-14 Liquid Impermeable Tester Simulated Baby Load Time 0~10 Min
..., mass per unit area(90±4) g/m2, air resistance(1.9±0.3kPa) Sample Size 125*125 mm Simulated baby load time 0~10min Load moving rate 5cm/(5±1)s Timer precision 0.1s Power AC 220±10%,...
Dongguan Haida Equipment Co.,LTD
Verified Supplier
Room 105, Building F4, District F, Tianan Digital City, Nancheng District, Dongguan City, Guangdong Province,China
IEC60745-2-5 Lower Guard Durability Test And Close Time Test Equipment With Circular Saw At A 90°Cut
...Test and Close time Test Equipment with Circular Saw at a 90° cut Product information: This device conforms to the standard requirement of EN 60745-2-5:2010 clause 19,IEC60745-2-5:2003 and Annex BB. It is used to test the Durability Test and Close time Test......
KingPo Technology Development Limited
Verified Supplier
RM C, 13/F, HARVARD COMMERCIAL BUILDING, 105-111 THOMSON ROAD, WAN CHAI, HK
ZXYZ-2002 Power Transformer Testing on Load Tap Changer Tester
...Load Tap Switch Tester Product Description In the "Electric power equipment handover and preventive test procedures", it is required to check the action sequence of on-load tap-changer and measure the switching time. Features 1. The output current is large and the weight is light. 2. The instrument output open circuit voltage 28V, in the current of 1A can test......
Wuhan GDZX Power Equipment Co., Ltd
Verified Supplier
No.1 Fenghuangyuan Second Road, Jiangxia District, Wuhan City, Hubei Province, China
Submit “test website load time” inquiry
This supplier has been verified by Everychina.com. Our verification process includes: 3 on-site visits by Everychina.com's service team!