Home /Construction Machinery Parts /

High Efficiency Diesel Concrete Pump Oil Absorption And Oil Return Filtration Technology

High Efficiency Diesel Concrete Pump Oil Absorption And Oil Return Filtration Technology

Brand Name:Zoomwolf
Certification:ISO
Model Number:HBT80SR21186C
Minimum Order Quantity:1 Set
Place of Origin:Changsha,China
Price:Negotiable
Contact Now

Add to Cart

Active Member
Location: Changsha Hunan China
Address: Yinpen South Road,Yuelu District,Changsha City,Hunan Province,China
Supplier`s last login times: within 24 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

100SR18186C High Efficiency Diesel Concrete Pump Oil Absorption And Oil Return Filtration Technology


Product introduction HBT100SR18186C


ZOOMWOLF concrete pumpHBT100SR18186C

This is a high output pressure(18MPa) concrete pump,powered by diesel engine.

Technical performance:

Output capacity(m3/h):57(high pres.)/103(low pres.)

Output pressure(MPa):18(high pres.)/10(low pres.)

Distribution Valve:S valve

Rated power of BF6M1013 diesel engine(kW):186

Oil pres.of the pumping system(MPa):32

Hydraulic system circle form:Twin-pump and -circuit open system.

Oil tank volume(L):500

Overall dimension L×W×H(mm):6460×1962×2620

Total mass(kg):6685


Vertical rising pipeline laying

① The rising lines can be laid along elevator well,scaffold or through prefab hole of floor in order to dismantle pipelines conveniently.

② Use new delivery lines when laying rising lines;when height is big,the thick wall pipes must be used at the bottom and are easy to dismantle;Elbows of vertical pipelines can't be used for the purpose of supporting,every lines should be supported by 1-2 bolsters.Straight and bent pipes must be fixed on wall,scaffold,tower or lift well in order to conduct the concrete gravity of lines from bolsters into the building.

③ As the vertical lines rise to a great height,the delivery concrete may incline to flow backwards,and give an impact to S valve.In order to reduce the shock,a certain length of horizontal lines should be laid between the machine and vertical lines to resist the concrete flowing backwards.The length of horizontal lines is not less than the 15%length of the vertical lines,and the shut-off valve should be installed at the horizontal lines of machine outlet,if delivery the concrete at high level.

④ If the pumping distance is very high and the volume of concrete output is large,you can lay two group parallel lines.If one group line is blocked,another pipeline can continue working.


China High Efficiency Diesel Concrete Pump Oil Absorption And Oil Return Filtration Technology supplier

High Efficiency Diesel Concrete Pump Oil Absorption And Oil Return Filtration Technology

Inquiry Cart 0