Home /Scaffoldings /

Easy Installation Industrial Building Environment Friendly

Easy Installation Industrial Building Environment Friendly

Brand Name:XGZ
Certification:CE1090,ISO9001
Model Number:XGZ-SIB004
Minimum Order Quantity:100 square meters
Delivery Time:30-55 days
Payment Terms:T/T, L/C, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: No. 268 Shenzhen Road, Pingdu City, Qingdao, Shandong Province.
Supplier`s last login times: within 21 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Easy Installation And Environment Friendly Steel Structure Industrial Building


Product Description


What is steel structure building?
Compared with traditional building like concrete building, wood building, steel structure building is a new quick installed building structure. The structure mainly comprises steel columns, beams, trusses, bracing, purlins, U channel, angle steel and steel plates, etc... They are connected together to be frame by welding, bolts and rivets.
Steel frame is typically consisting of vertical columns and horizontal beams which are bolted or welded together. Steel columns are vertical structural members that transfer compressive loads. It can be used to form the skeleton of a building. Steel beams are horizontal structural members that resist loads applied laterally to their axis. Structural steel framing is typically designed, fabricated and erected in accordance with applicable standards to ensure its safety.
All steel structure buildings’ components are detailed and manufactured in the factory. To cut, drill and weld strictly following the manufacturing drawings to ensure that the structure tolerance is less than 2mm.


Product Parameters


Components of steel structure industrial building:
● Primary Framing Elements
Columns, beams members are made by H section steels( hot rolled section steel/ welded section steel), which will be easily bolted together at site. A factory primer and facing paintings or galvanization surface treatment are applied to get better anti-rusting effect of primary framing elements.
● Secondary Framing Elements
Purlin, tie bar are formed as secondary framing, which will fix on columns and beams by common bolts.
● Bracing
Round steel is supplied with knee bracing and other supporting parts that need portal framing, which will improve the stability and durability of the whole structural hangar.
● Cladding
Roof and Wall are covered by color-coated corrugated steel sheet or steel sandwich panel, hot dipped with zinc and aluminum compound, that is fixed to the outside of structural building to protect it against bad weather or to make it look more attractive and last for generations.
● Windows and Doors
Plastic Steel Window/Aluminum-alloy Window; Sliding Door/Folding Door.
● Other Options:
Gutter, Downpipe, Transparent sheet, Ventilator and Bridge Crane will be fitted according to client’s requirements.

ItemsSpecification
Main Steel FrameColumnQ235, Q355 Welded H Section Steel
BeamQ235, Q355 Welded H Section Steel
Secondary FramePurlinQ235 C and Z purlin
Knee BraceQ235 Angle Steel
Tie Rod

Q235 Circular Steel Pipe

BraceQ235 Round Bar
Maintenance SystemRoof PanelEPS Sandwich Panel/ Giass Fiber Sandwich Panel/ Rock Wool Sandwich Panel
Wall PanelSandwich Panel/ Corrugated Steel Sheet
AccessoriesWindowAluminiumn Alloy Window/ PVC Window/ Sandwich Panel Window
DoorSliding Sandwich Panel Door/ Rolling Metal Door/ Personal Door


Application


Applications of steel structure industrial building
- Warehouses
- Workshops
- Factory
- Plant

- Steel Shed


Advantages of Steel Structure Industrial Building


1. Steel structure has light weight;
2. Steel structure has good seismic and impact resistance;
3. Steel structure manufacturing is highly industrialized;
4. Steel structures can be assembled accurately and quickly;
5. The steel structure industrial building can be recycled after disassemble;
6. Steel structure industrial building construction peroid is short.


Design And Quote


We can help your idea drawing come true, if not drawing yet, after clear on the following infos,we can prepare drawing accordingly for you.
1. Where is the location? Any idea on the wind load, snow load, anti-earthquake level?
2. What’s size length x width x height?
3. How you like to make the wall? Brick wall, or single steel sheet, or wanna insulated sandwich panel?
4. How about the roofing? you like single roofing sheet? or insulated sandwich panel?
5. Whether overhead crane needed or not? if yes what’s the lifting weight and height required?
6. Would you like to make second floor? or just make single floor(ground floor)?
7. What’s quantity & size for door and window?


Quality Control


We have passed the CE and ISO9001 certifications, which demonstrate our commitment to excellence and adherence to international standards. The CE certification ensures that our products meet the essential health, safety, and environmental protection requirements within the European Economic Area. Additionally, the ISO9001 certification signifies our dedication to maintaining a robust quality management system, ensuring consistent delivery of high-quality steel structure solutions.


Product Processing


1. Cutting
Steel components, such as beams, columns, and plates, are precisely cut to the required dimensions using advanced cutting techniques, such as Automatic laser cutting machine, to ensure accurate fitment during assembly.
2. Assemble
The cut steel pieces are fitted together according to engineering drawings and specifications.
3. Welding
Welders employ various welding techniques, to join the steel components securely. Welding creates strong and resilient connections, enhancing load-bearing capacity.
4. Rust removal
Before surface treatment, any rust or scale on the steel surfaces must be removed. Techniques like sandblasting, shot blasting, or chemical cleaning are used to eliminate corrosion, creating a clean and smooth surface.
5. Surface treatment
Spray painting or hot-dip galvanizing according to customer's requirements, so that the surface is not corroded.


Packaging And Shipping


Packaging Detail:
The packing method for main steel frame will use steel pallet, which can be better to protect steel frame and make the loading and unloading faster and more convenient since it could be taken as a whole. It could also save the quantity of shipping containers and cost of ocean freight.
Other parts packed in parcels such as steel purlin and steel sheet, all loaded into 40ft HQ. Safe and easy handle.


FAQ


1. What kind of company you are?

We are steel structure building Manufacturer located in Qingdao China.

2. What are your main products?

Our main products have steel structure,warehouse,workshop,factory,office building, hangar,garage,poultry house...

3. What kind of drawing will you provide?

Plan drawing, elevation drawing, sectional drawing, foundation drawing, installation drawing.

4. Can we visit your factory?

Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

5. Can you send engineers to install my structures?

We can provide you with detailed installation drawings and videos for free, and we can also send engineers as installation directors upon request.


China Easy Installation Industrial Building Environment Friendly supplier

Easy Installation Industrial Building Environment Friendly

Inquiry Cart 0