Home /Other Ladders & Scaffoldings /

7.05KG ring lock handrail to protect workers' safety for Indonesia scaffolding project made by Guangdong factory

7.05KG ring lock handrail to protect workers' safety for Indonesia scaffolding project made by Guangdong factory

Brand Name:Gainford
Certification:ISO. SGS, TUV
Model Number:GFRLHR
Minimum Order Quantity:20 tons (can fix with other scaffolding products)
Delivery Time:7-20 working days
Payment Terms:T/T, L/C, Western Union
Contact Now

Add to Cart

Active Member
Location: Dongguan Guangdong China
Address: No.2 Liantangjiao Industry Area, Jianshe Road, Shima Village, Tangxia Town, Dongguan, Guangdong, China
Supplier`s last login times: within 41 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

7.05KG ring lock handrail to protect workers' safety for Indonesia scaffolding project made by Guangdong factory


Ring lock handrail functions and features

Galvanized handrail normally be used with stair case or ladder in ring lock scaffolding system or other modular scaffold systems. It is complined with pipes of 33mm OD or 36mm, it is one of the part of ring lock scaffolding system, can protect the workers' sercurity ring lock scaffolding system has features as below:


1. Safer and more stable than other scaffold system.

2. With hot dip galvanized finish can expand life span to 20 years.

3. Easy for erection and dismantlement, convenient and can save much time & labor.

4. Compared with cuplock can save 1/3 steel around, save time & time & labor.

5. With good look in project image


Ring lock handrail dimensions

NameO.D(mm)Thickness(mm)Height(mm)FinishWeight(kg)
Ring lock handrail332.00500Pre galvanized7.05
Ring lock handrail332.00800Pre galvanized8.23
Ring lock handrail332.001000Pre galvanized9.18
Ring lock handrail362.20500Pre galvanized8.16
Ring lock handrail362.20800Pre galvanized

9.38

Ring lock handrail362.201000Pre galvanized10.29

Remarks: we can do any sizes as the requirement of customers.


How to make a ring lock handrail?

Step 01 --- Preparing raw material and cutting pipes.


Step 02 --- Bending the pipe.


Step 03 --- Letting mould to match and correct it.


Step 04 --- Welding the hardrail.


Step 05 --- Polishing the welding dots for handrail.


Step 06 --- Do some painting on the welding dots and waiting for packing.

Remarks: Actually our daily routine for handrail process is more complicated and serious, welcome to our factory for checking and supervising!


Packing and loading details for ring lock handrail

We packed handrail by bundles with steel belt


Application for handrail and ring lock scaffolding system

Handrail is used to protect workers' safety when they doing construction works. Ring lock scaffolding system, as the most popular modular scaffold system, can be widely used in many construction projects, especially some irregular engineering projects, such as:


#1. Brigde building

#2. Tunnel

#3. Viaduct

#4. Water tower

#5. Hydropower plant

#6. Oil refinery

#7. Stage set-up

#8. Sports stadium and so on


Factory images browsing

Pls check our factories' pictures, sincerely welcome your coming and you will find more interesting things here for you!


Supportings and advantages with Gainford Scaffolding

1. HIGH QUALITY PRODUCTS-We are the Hongkong Enterprise, we focus on the high quality control all the time. We have professional production team, can produce each piece of product with qualified standard.


2. THE LOWEST & COMPETITIVE PRICES- We sincerely do business with every customer with suporting you the lowest prices, make you become more competitive from the fierce competitions, help to create value & profit for you. We'd love to make friends with you! You happy then we are happy.


3. PUNCTUAL DELIVERY TIME- We are the Hongkong Enterprise,our factory is in Dongguan, which is near to Shenzhen port, from Shenzhen to your port can save half transportation time than any China North port , can reach your promotion season and no-delay for your constrution time.


4. THE BEST SERVICES- We have the professional exporting team can be available to offer you service at any time everyday! And we have skilled scaffolding experts, can solve any problems no matter the single products or the construction solution!


5. WE NEVER BE AFFECTED BY LIMITATION PRODUCTION CONTROL- Because we are southern factory in China, no fog haze and governament control measures here, we have a blue sky here and we can produce any product at any time for you!


We sincerely hope to cooperate with you, my dear friends!

Any scaffolding enquiry is welcome and appreciated~ Let us to be your warehouse and factory in China!


Hi, you might be interested in other products as below:

1.Scaffolding ring lock standard

2.Scaffolding ring lock vertical diagonal

3.Scaffolding ring lock horizontal diagonal

4.Scaffolding ring lock bone pin spogit

5.Scaffolding ring lock base coller

6.Scaffolding ring lock ledger


Pls contact us:


My name is Ms. Emma Xiao


My Moblile: 0086-188 1370 6671(what's app) ; 0086-189 2821 8872


My Skype: nisa8895


My Wechat: momo15874281005 ; Emma18928218872


My QQ: 2758278809


My Email: gfscaffolding@gmail.com ; emma@scaffoldgainford.com


Pls don't forget to contact me! Welcome to China, I gotta be your guide here!


Hope you have a nice day ^_^

China 7.05KG ring lock handrail to protect workers' safety for Indonesia scaffolding project made by Guangdong factory supplier

7.05KG ring lock handrail to protect workers' safety for Indonesia scaffolding project made by Guangdong factory

Inquiry Cart 0