Home /Plastic Product Making Machinery /

PLC Control Polyurethane Foaming Machine , Sponge Mattress and Memory Foam Production Line

PLC Control Polyurethane Foaming Machine , Sponge Mattress and Memory Foam Production Line

Brand Name:ZHMACH
Certification:CE
Model Number:ZHF-2017
Minimum Order Quantity:one set
Delivery Time:45days after receive downpayment
Payment Terms:Western Union, L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Supplier`s last login times: within 30 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

PLC Control Polyurethane Foaming Machine, Sponge Mattress and Memory Foam Production Line


Specification


This machine is mostly used to produce large-scale continuously foaming production (density is about 6 to 100 kg/m3). It adopts the advanced touch screen and PLC Operation System, its automatization level is high, the production is low-cost and the quality fo foam is outstanding .
It is the most ideal equipment for large-scale foaming produce . Man-machine interface, non-stop the machine can change formulas, it can produce the British elevation high-slow rebound, electronic cotton, brassieres cotton, polyester-cotton, yellow-resistant up to 3-5 level, add powder 10 to 200 parts, the lowest density 6-100, it also can produce on machine .


Main specification


Oven Length18m
Foam Height1.0-1.25m
Foam Width1.0-2.25m
foam density8-200kg/m³
total power130KW
inner conveyor length18m
side board adjustable width0.98-2.3m
conveyer belt speed0-8m/min
fall plateseven sections adjustable
total output100-300kg/min
machine dimensionL35× W4.2 ×H3.2m

Main technique specification:


DimensionTotal length 35m×Total width 4m×Total Height 3m
Foaming material Group13 groups, man-machine interface, both manual and automatic computer control
Foaming width980mm~2250mm
Foaming heightMax 1200mm
Foaming density8Kg/m³~100kg/m³
Foaming speed2000r/min~7000r/min
Max total output300kg/min
Material spraying way① The way of down sprayer head (upper, down, front, the back can be adjusted) ② the way of the trough overflow pipe.
Controlling way of foaming

①PLC controlling can continuously foam two different formulas in one time

②All inverter controlling foaming and work in phase with the production line

③Oven declining board height and width can be adjusted by the control box.

④Oven side links width can be adjusted by the control box

Mixing –head motor

37kw

Total power

About 90kw

How is the packing of the machine?


The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be a simple pack with paper or foam sheets with plastic film.


How many containers will be needed for the whole set of machines?


For the standard 13 groups of Automatic continuous foam machine Total, three containers are enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery, we will also put some parts inside the raw material tank.

We will try the best way to pack all the machine well and also save the freight cost.


Our Services

1. We will help to design the layout of the machine that put in your factory.

2. We will send 2-4 experienced engineers to install and testing the machines.

3. We will teach your engineer how to operate the machine and how to maintain the machines.

4. We will give you the machine operation manual and the best formulation for target products that you are going to make.

5. We will help to buy the best raw material for making the foam if you needed.


FAQ:


Q: How many days for the install and testing of the machine?


A: After all the machines in your factory we will send 1-2 engineers to help to install the machine you must send someone to help about 30 days installation will be finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.


Q: For the cost of the engineer how much I need to pay?


A: You need to pay USD40 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.


Q: What kind of raw material tools we need to prepare for the testing?


A: We will send you a list of the tools that you need to prepare for testing and also can help to buy if you required.


Q: After the machine testing if we need some engineer to stay in our factory can you help to find?


A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all the details with him.


Q: During the foaming if we have some problems abt the foam and the machine how can we do?


A: You can just call our after-sale manager explains for the situation or send some pictures we will help to handle within 24hours.


Q: During the using of the products if we find some problem how can we live?


A: You can just help to check in the operation manual and the video first if can’t work just call our after-sale service.


Q: How many spare parts for you to give us?


A: We will send you all the necessary spare parts that free of charge together with the machine. After that, you need to buy it.


The main part of the machine




automatic foaming machine line.pdf

China PLC Control Polyurethane Foaming Machine , Sponge Mattress and Memory Foam Production Line supplier

PLC Control Polyurethane Foaming Machine , Sponge Mattress and Memory Foam Production Line

Inquiry Cart 0