Home /Gas Water Heaters /

Fire Tube Structure Small Gas Hot Water Boiler High Safety Operation

Fire Tube Structure Small Gas Hot Water Boiler High Safety Operation

Brand Name:LEWAY BOILER
Certification:SGS, ISO, OHSAS
Model Number:CLHS
Minimum Order Quantity:1
Delivery Time:Average 15 Days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Jiaozuo Henan China
Address: Northwest Crossing of Changwu/ Hongyuan Road, Zhandian New District, Wuzhi, Jiaozuo, Henan, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Simple Structure Safety Operation Small Gas Hot Water Boiler


Product Description

1.Furnace big, high radiate, three return design, combustion air is full, high-efficiency heating surface. Using high thermal resistance of insulation materials, boilers, heat losses to the minimum


2.More than 90% thermal efficiency. Intelligent, automatically control, with automatic temperature regulation, over-temperature standby.


3.Burners are used by importing, pressure spray, burning completely, low noise. thus Combustion intensity will be reduced dust emissions reduction of harmful gases.


4.Confined by connecting structure, safe, reliable, long service life. Super temperature, cut water, overload, ignition failure, abnormal flameout, gas boiler pressure, all can do self-test multiple chain protection.


Advantages


1. Advanced boiler series, big burning chamber design.


2. World famous riello or baltur burner configuration.


3. High fuel efficiency, high heat transfer area and energy-saving


4. Overtemperature,overpressure, water lackage,flameout and the other protection functions


5. ISO certification, high reliablity ,low maintenance cost

Hot Water Boiler Model


Item/Unit/ModelCLHS 0.06- 85/65-Y(Q)CLHS 0.08-85/65-Y(Q)CLHS 0.12-85/65-Y(Q)CLHS 0.175-85/65-Y(Q)CLHS 0.24-85/65-Y(Q)CLHS 0.35-85/65- Y(Q)CLHS 0.48-85/65-Y(Q)

CLHS 0.7-

86/60- Y(Q)

Rated Heat CapacityMW0.060.080.120.1750.240.350.480.7
Working PressureMpaNon-pressure
Output Water Temp85
Input Water Temp65
Thermal Efficiency%90
Water VolumeL1401862503104206606601400
Water OutletDN50505065658080100
Water InletDN505050656580801400
Drain ValveDN50505065658080100
Electric ConsumptionKw/h0.30.30.40.650.8113.3
Chimneymm159159219219219219219300
DimensionsLengthmm640750750800910106010751400
Widthmm640750750800910106010751400
Heightmm13201330156016501770194019802600
Base Dimensionsmm640×640750×750750×750790×790910×9101060×10601160×11601400×1400
Transport WeightKg2913353634335698309101274
Fuel ConsumptionDieselKg/h5.67.511.316.422.532.852.165.7
Natural GasNm³/h6.68.8613.219.426.638.842.277.5
City GasNm³/h13.217.726.438.853.277.6106.4155
Largest Transport SizeLengthmm710795805860975113011351470
Widthmm7307307308941010115011551500
Heightmm13251325156216521771200120212331

Quality Assurance


1.Strength calculation test report of applied materials

2.Whole set of pure water processor line featured with RO anti-saturation and advanced testing devices

3.Hydraulic test report: ensure the standard working pressure and safety

4.Third-party inspection report-Jiaozuo Special Equipment Inspection & Technical Research


FAQ


A1: LEWAY Boiler provides completed installation drawing and manual, or send engineer abroad for installation guidance


Q2:How many years is the boiler’s life span


A2: The boiler is designed for 10years life span, but under good maintenance, usually the boiler can use at least 16years, LEWAY Boiler provide full life after-sales service to each sold boiler


Q3: How is the warranty term?


A3: If any problems caused for quality during the warranty period, the Seller will repair or replace the broken parts for free, if the problem caused from the client’s side, the Seller will help supply the spare part at lowest cost.


China Fire Tube Structure Small Gas Hot Water Boiler High Safety Operation supplier

Fire Tube Structure Small Gas Hot Water Boiler High Safety Operation

Inquiry Cart 0