Home /Steel /

Self Climbing Formwork System Versatile Backets For High Rise Buildings

Self Climbing Formwork System Versatile Backets For High Rise Buildings

Brand Name:HORIZON
Model Number:Climbing scaffold
Minimum Order Quantity:60 sets
Delivery Time:20-25 days
Payment Terms:L/C, T/T
Place of Origin:CHINA
Contact Now

Add to Cart

Site Member
Location: Xingtai Hebei China
Address: VICTORIA HOTEL BUILDING, ZHONGXING ST. XINGTAI, HEBEI, CHINA
Supplier`s last login times: within 48 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Versatile Backets for All Types of Climbing Applications in High-rise Buildings


Climbing Formwork CB240 is a crane-dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.

• The sets made up of brackets and formwork panels are moved to the next pouring step with one single crane lift.

• Adaptable to any structures, including straight, inclined and circular walls.

• It is possible to build working platforms at different levels. The access to the platforms is provided by safety ladders.

• All brackets include all the connectors to fix handrails, push-pull props and other accessories.

• The climbing brackets allow rolling-back the formwork panels using a system, formed by a carriage and a rack, incorporated in these brackets.

• Formwork’s vertical adjusting and plumbing is completed with leveling screw jacks and push-pull props.

• Brackets are anchored to the wall with anchor cone system.


1. Climbing bracket


2. Main platform


3. Pouring platform


4. Finishing platform


5. Roll-back system


6. Push-pull prop


7. Vertical waling


8. Anchor system


9. Formwork

Climbing sequence:


Step 1

The first pouring is to be completed by using the proper wall elements and has to be exactly aligned with adjusting struts.


Step 2

The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured.

Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed.


Step 3

After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system.


Step 4

Release and remove bolts that fixing the positioning anchor point.

Loosen and remove tie-rod

Loosen the wedges of the carriage unit.


Step 5

Retract the carriage and lock it with wedge.

Install upper climbing cones

Loosen wind securing device, if any

Remove the lower climbing cone


Step 6

Adjust the carriage into the common center of gravity and lock it again.

Attach the crane sling to the vertical waling.

Remove the security bolts of the bracket.

Lift the climbing bracket by crane and attach it to the next prepared climbing cone.

Insert and lock the security bolts again.

Install the wind-load device, if required.


Step 7

Move the carriage back and lock it by wedge.

Clean the formwork.

Install reinforcement bars.



Step 8

Move the formwork forward until lower end rests against top of the finished section of the wall.

Adjust formwork vertically by means of push-pull brace.

Fix tie-rods for the wall formwork