Home /Tool Processing Services /

SKH51 EDM Processing CNC Machined Components WIth Material Certification

SKH51 EDM Processing CNC Machined Components WIth Material Certification

Brand Name:Kingrui
Certification:ISO9001: 2008
Model Number:KR006
Minimum Order Quantity:1 Pcs
Delivery Time:Normally, simple parts,5- 7 workdays, complicated parts 7- 15 workdays, according QTY and the complexity of drawing.
Payment Terms:T/T 50% as deposit 50% before shipment
Contact Now

Add to Cart

Active Member
Location: Dongguan Guangdong China
Address: Building A, No9, Xinxing Road, Shatou South Area, Chang'an Town, Dongguan China
Supplier`s last login times: within 33 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details


SKH51 EDM Processing CNC Machined Components WIth Material Certification


Introiduction of CNC machined component


1. Material: SKH51, It is suitable high speed steel tungsten steel, for manufacturing strong cutting wear and impact resistance of various tools, advanced die, die, toughness and complicated shape tool, milling cutter, drill etc..


2. Machining: As for this, one CNC machined component, is completed by three processes, Namely, surface grinding, wire EDM, and precision EDM.


3. Machined Equipements: Japan mitsubishi mirror EDM machine, surface grinder, wire- EDM.


4. Surface finish: mirror polishing, polishing, DLC coating, PVD coating and more.


5. Applied software: Pro/ E, Auto CAD 2000, solid work 2001, CAXA, UG, CAD, CAM


6. Product weight: according to your drawings.


Relevant specifications of CNC Machined Components


Item Name

Precision EDM Processing CNC Machined Components WIth Material Certification of SKH51


Part MachiningCustomized is welcomed
Materials

Steel, stainless steel, aluminum, copper, brass, bronze are available


Size

Per your drawings


Surface Finish

Zinc Plating, Nickel Plating, Chrome Plating, Passivation, Hardening, High Frequency, Clear Anodizing, Black Anodizing, Black Oxide Coating, Degreasing, Brushing


Precision

Grinding precision: 0.001 mm; EDM precision: 0.002 mm; Surface roughness: Ra0.4 um. Or as per client requirement.


Inspection

Microscope / Micrometer / Projector / High Gage / Roughness Tester etc.


Part Color

According to customer’s demand, or the color of the metal itself


Certificate

ISO9001: 2008


MOQ

1PCS


Price

We can discuss it


Lead Time

Within 5-15 working days



Different Surface Treatment Instructions


Black Oxide

Parts have been heat-treated for hardness, which results in a dark surface color.


Zinc Plated

Parts have a protective coating that adds corrosion resistance for outdoor use.



Nickel &Chrome

Plating

Parts have a protective coating that adds corrosion resistance with beautiful look
Clear&Black Anodizing

corrosion resistance with beautiful look also very light, Aluminum material use most.


Brushing

Generally, the stainless steel material will make brushing look



Delivery


1, We have cooperation with China Post, DHL, UPS, FEDEX, EMS and so on, we may give you some advice of transportation.
China Post: For the package under 2kgs, Usually need 25-35days to get the package.
SHL, UPS, Fedex IE: For the package over 2kgs. If the package is under 20kgs, Shipping cost will be little high, For the package is over 20kgs, these express will be more economic.
Usually need 5-9days for the packages can be arrived. Tracking number can be offered after the package be sent out(for some country and area, It has remotes and contacted with us to check your area to check, for the remotes will cost remotes fee)
EMS: Most safety shipping way, Usually need 7-10 days to get the package.
Fedex IP: Most fast shipping way, Usually need 2-5 days to get the package, Especially for USA customers. Just 2-3 days to get the package. But cost little high.


2, If the order is big, we usually suggest you to use Air Freight, please inform us the nearest airport or port, we can help you check the best cost before shipment.


3, During or near to the Holidays and Festival, as so many packages be stucked at the customs, some packages will be delayed for few days, please kindly understand this.


4, All of the balance need to be paid before the shipment or bill of leding.


China SKH51 EDM Processing CNC Machined Components WIth Material Certification supplier

SKH51 EDM Processing CNC Machined Components WIth Material Certification

Inquiry Cart 0