Add to Cart
Standard | ASTM A214, A450 |
Matrial | Q195, Q215, Q235 etc Carbon Steel |
Size | OD: 6.76.2mm WT: 1-20mm Length: 1-12m |
Manufacture | Tubes are made by electric-resistance welding. |
Surface Condition | The finished tubes are free of scale., slight amount of oxidation
is not considered as scale |
Hardness Requirements | The tubes shall have a hardness number not exceeding 72HRB. |
Thermal Treatment: | After welding, all tubes are heat treated at a temperature of
1200℉(650℃) or higher and following by cooling in air or in a
cooling chamber of a controlled atmosphere furnace. Cold drawn tubes shall be heat treated after the final cold-draw pass at a temperature of 1200℉(650℃) or higher |
Test and Inspection | - Flattening Test - Flange Test - Reverse Test - Hydrostatic or Nondestructive Electric Test |
Tolerance for OD and WT (SA-450/SA-450M)
OD in (mm) | + | - | WT in (mm) | + | - |
<1" (25.4) | 0.10 | 0.10 | ≤1.1/2" (38.1) | 20% | 0 |
1"~1.1" (25.4-38.1) | 0.15 | 0.15 | ≤1.1/2" (38.2) | 20% | 0 |
>1.1/2"~<2" (38.1-50.8) | 0.20 | 0.20 | |||
2"~<2.1/2" (50.8-63.5) | 0.25 | 0.25 | |||
2.1/2"~<3" (63.5-76.2) | 0.30 | 0.30 | |||
3"~<4" (76.2-101.6) | 0.38 | 0.38 | |||
4"~<7.1/2" (101.6-190.5) | 0.38 | 0.64 | |||
>7.1/2"~9" (190.5-228.6) | 0.38 | 1.14 |
C | 0.18 |
Mn | 0.27 to 0.63 |
P | ≤0.035 |
S | ≤0.035 |
Production Show
QUALITY CONTROL:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring
Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield
Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a
perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate
longitudinal and transversal defects.
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and
solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is
30-60 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it
free or extra ?
A: Yes, we could offer the sample for free charge but need pay the
cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
TORICH ASTM A214 ERW Carbon Steel Heat-Exchanger and Condenser Tubes