Home /Biogas /

Turnkey EPC Project Biogas Power Plant with Anaerobic Digester Glass Fused-to Steel Tank

Turnkey EPC Project Biogas Power Plant with Anaerobic Digester Glass Fused-to Steel Tank

Brand Name:CEC TANKS
Certification:ISO 9001:2008, AWWA D103 , OSHA , BSCI
Model Number:W20161227011
Minimum Order Quantity:1set
Delivery Time:0-60 days after deposit received
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou Guangdong China
Address: Fuli Commercial Center room 301#, Xingang West Rd.11#, Haizhu area, Guangzhou, Guangdong province, China.
Supplier`s last login times: within 48 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Turnkey EPC Project Biogas Power Plant with Anaerobic Digester Glass-Fused-to-Steel Tank


Catalogue-Center Enamel.pdf


What is Glass-Fused-to-Steel?


Glass-Fused-to-Steel is two materials, enamel frit and raw steel are fused together after two coating and two burning with 800-900℃ temperature, to achieve the best cohesion –the strength and flexibility of steel combined with the corrosion resistance of glass. Applied to both interior and exterior surfaces, Glass-Fused-to-Steel is able to provide many years of trouble free service in harsh environments.


GFS Tank


Glass-Fused-to-Steel (enamel-assembled) tank technology is a tank manufacturing technology to use high-strength steel substrate special for enamel and adopt professional enamel technology to have anti-corrosive glaze layer with high inertia fused on the surface of substrate and made into standardized steel module; after packed and transported to the project site, the tank forming is finally completed through low cost and rapid installation.



Advantages of GFS tank:

  • Fast installation and short construction period
  • Anti-corrosion property is superior, and the inorganic and organic environment adaptability is strong
  • Good appearance improves the image of the project
  • The temperature adaptability is strong and construction is available in cold weather
  • It can be combined with various process to form assembled reactor and improve the added value of reactor
  • Factory production, advanced systematic and standardized degree, and high quality controllability
  • Low maintenance
  • More than 30 years service life
  • Easy to expansion

Double Membrane Gas Storage



Double membrane gas storage cabinet is mainly used for storage of biogas and landfill gas. It consists of external membrane, internal membrane and basement membrane. Air is tight between external membrane and internal membrane. The external membrane forms outer sphere shape for protection, while internal membrane for storage of biogas. Gas storage cabinet is set with explosion-proof blower to automatically regulate the access amount of gas as required to maintain the stability of pressure in the gas cabinet and meanwhile, to protect the external membrane in bad weather conditions.


Advantages of double-membrane gas storage cabinet:

  • Industrialized production with reliable quality
  • Short construction period: the installation can be completed in 3-5 days
  • Anti-corrosion property of membrane material is superior and the corrosion of 8,000ppm hydrogen sulfide is resistable
  • Low pressure gas storage with high safety
  • Available to solve anti-freezing problem in winter
  • The internal membrane is viol resistant and anti-aging with long service life

China Turnkey EPC Project Biogas Power Plant with Anaerobic Digester Glass Fused-to Steel Tank supplier

Turnkey EPC Project Biogas Power Plant with Anaerobic Digester Glass Fused-to Steel Tank

Inquiry Cart 0