Home /Mosaics /

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Brand Name:DAO
Minimum Order Quantity:50m
Delivery Time:15 working days
Payment Terms:T/T
Place of Origin:Jiangsu, China
Price:Variable
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: Building 5, No. 1288, Kungang Highway, Songjiang district, Shanghai city
Supplier`s last login times: within 3 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Wet liner for CIPP UV renovation of underground pipes by no digging method


Pull the lamp rope with the reserved rope

The reserved rope and the pull light rope shall be connected with a dead buckle to ensure that they will not fall off accidentally, and the nodes shall be wrapped with adhesive tape. Especially for the rope end of the lamp rope, it is easy to cause the inner membrane to scratch during the dragging process.

In the process of pulling the lamp rope down into the material with the reserved rope, it must be operated when the material is inflated. Otherwise, it is easy to cause inner membrane damage.


Lower lamp

Under the light of the link is the most cause intimal damage. Be careful. Before lowering the lamp, check the lamp wheel, lamp body, and connecting wire for burrs and resin. If any, clean it and treat the wheel smoothly. If it is a headlamp wheel, it is recommended to wipe a small amount of grease to reduce the friction of the material's inner membrane when the headlamp is lifted and lowered.


During the process of lowering the lamp, it is necessary to ensure that the material bulges up and the lamp enters the material smoothly without obstacles. If it cannot enter smoothly, it is necessary to find out the reasons for the obstacles. It is not allowed to drag or kick. Most of the inner membrane damage occurs at this time. The lamp shall be pulled into the material as far as possible, and sufficient length shall be reserved for the binding head for easy operation to avoid hindering the lifting of the headlamp.


MaterialWet liner
Technology appliedTT
LengthAny length is possible

China Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging supplier

Sewer Cured In Place UV Cured CIPP Liner Wet Material Raw Contractors Underground No Digging

Inquiry Cart 0