
Add to Cart
Product Description
The RCZ421T is a high-performance surface down-the-hole drill
designed for blasting drilling in mining and quarrying. It can
drill holes with a diameter of φ80–115 mm and is equipped with a 12
m3/min, 15 bar air compressor and a dry dust collector. Equipped
with a Yuchai YC6J190 propulsion system, the drill uses an
integrated single-engine system that drives both the air compressor
and the hydraulic system, reducing fuel consumption by 35% and
maintenance costs by 50% compared to traditional drills. Its rugged
design incorporates world-renowned hydraulic components to ensure
reliability and low maintenance costs.
Equipped with a two-speed hydraulic travel mechanism, the RCZ421T
has excellent all-terrain maneuverability, and its rugged slewing
device ensures smooth, high-torque drilling and minimizes drill
sticking. The two-stage dry dust collector improves environmental
protection and productivity, while the integrated air compressor
simplifies fleet management for long-distance operations. It's a
cost-effective solution for modern mining and quarrying!
| Item | RCZ421T hydraulic DTH blasthole drilling rig |
| Applicable Industries | Energy & Mining, Construction works, Drilling |
| Weight | 6800KG |
| Core Components | Motor, Engine, Gearbox |
| Drilling Diameter | 90-115mm |
| Drilling Depth | 20M |
| Drilling pipe | 60mmX3m |
| Drilling Type | Rotary Drilling Rig |
| Dimension(L*W*H) | 6,000X2,300x2,750mm |
| Power | Yuchai YC6J220 162 kW |
| Rotation Torque ( Max.) | 1,950 N.m |
| Rotation Speed | 60-120 rpm |
| Working Pressure | 15 bar |
| F.A.D | 12 m/min |
| Tramming Speed (Max.) | 2/3 km/hDual Speed |
| Gradient | 30° |
| Track Frame Oscilation | ±10° |
| Dry Dust Collector | Standard |
| Dual Speed Walking Motor | Standard |
1. The heavy-duty slewing system has a maximum torque of up to 1950
Nm and a rotation speed that can be adjusted between 60 and 120
rpm, ensuring efficient drilling in various rock conditions.
2. The drill has a ground clearance of 400 mm, providing flexible
drilling positions, can drill holes with a diameter of 90-115 mm,
and a maximum drilling depth of 20 meters.
3. The newly designed protective cover is equipped with a quick
access panel, which significantly improves maintenance efficiency
while protecting key components.
4. The ergonomic console integrates all drilling functions and
provides clear instruments for the operator to operate accurately.
5. The standard two-stage dry dust collection system with an air
volume of up to 12 m³/min can efficiently remove debris and ensure
a clean working environment.
6. The dual-speed chassis provides speeds of 2 km/h and 3 km/h,
combined with heavy excavator-level tracks, which can provide good
maneuverability on slopes up to 30 degrees.
Image