Home /

Semi Auto Batch Foam Making Machine For Furniture , Sponge Manufacturing Machine

Semi Auto Batch Foam Making Machine For Furniture , Sponge Manufacturing Machine

Brand Name:ZHMACH
Certification:CE Certificate
Model Number:ZHF-2017-7
Minimum Order Quantity:one set
Delivery Time:45 days
Payment Terms:Western Union, T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Supplier`s last login times: within 30 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Batch Foam Making Machine For Furniture / Foam Mattress Production Line


Company Information


Foam/Sponge producing machine with pneumatic motion,which can be used with Rectangular,Cubic and Cylindrical Molds.The speed of the Mixer can be controlled electronically from control panel.The small Raw-Materials are put in to the Tank manually.Its products used in Bed,Furniture and all kind Sponge Producing Factories.


ZHF-2017-7 Semi-Auto Foam Making Machine


Main technique specification:


1, Dimension:L2.8 m×W1.5m×H2.5m

2, Foam mould size(can be adjusted): W1500-2000×L2000-3000×H1200 two sets

3, Foaming material Group: 7 groups, man-machine interface control

4, Foaming height: Max 1200mm

5, Foaming density: 8Kg/m³~100kg/m³

6, Foaming speed: 2000r/min~7000r/min

7, Max total output:230L/time

8, Mixing –head motor: 11kw

9, Total power: About 43 kw


Maxing Tank Capacity180L~250LOil Hydraulic System1 set
Mixer Total Power11kwElectric float top system1 set(electric)
Mixing Speed0~2800r/minAir Filtering System1 set
Save Formular Q.T.Y6 groupswater tower1set
Control systemPLC Touch Screen Control SystemWater pump1set
PPG Tank3ton*1setFoaming dengsity range6~100kg/m3
POP Tank3ton*1setoutput48block/per day/8hrs(230m3/day)
TDI Tank2ton*1setMatch with one square mould,foaming sizeL2000m*W2000m*H1200m(to be requested)
MC Tank2ton*1setMatch with one Cylinder mould,foaming sizeDia1800mm*H2200mm(To be requested)
Air valvesEuro standardTotal motor powerapprox 25kw
Auto loading&feeding pumps for PPG,POP,TDI,MC4 sets(china brand)Machine N.Wapprox 6ton
Chiller(both cooling&heating system)1 set*7.5kw(made in Taiwan)Floor space requiredL10m*W10m*H6m

Main collocates and material chooses:


Material pot types: (The work pressure in the pot is normal pressure)


TypeUse

Specification

Qty
Big material tankPPG+mixture material3m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
Big material tankTDI2m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1


Big material tankMC

1m³/δ2mm stainless steel

1
Small material tankSi,T9,A33,Color80L/δ1mm stainless steel4

Transducer Types


ModelPower/kw

Use

QtyBrand
VFD-B11

Mixing head

1Delta
VFD-B5.5

PPG

1Delta
VFD-B3.7

TDI

1Delta
VFD-B2.2

MC

1Delta
VFD-B1.5Si,T9,A33,Color

4

Delta

Motor types:

ModelPower/kw

Use

QtyBrand
Y200L-211

Mixing head

1Guangdong
Y132S-4 Horizontal7.5

PPG

1Guangdong
Y132S-4 Horizontal3.7

TDI

1Guangdong
Y100-4 Horizontal2.2

MC


1Guangdong
Y100-6 Horizontal1.5

Ann, Si, Tin, Color,

4Guangdong
Y100-4 Vertical2.2

PPG material mixing


1Guangdong
Y100-4 Vertical1.5

TDI Mixing

1Guangdong
Y100-4 Horizontal2.2

PPG mixing

1Guangdong
Y100-4 Horizontal2.2

TDI filing

1Guangdong

Our Services


We will help to design the layout of the machine that put in your factory.

We will send 2-4 experience engineers to install and testing the machines.

We will teach your engineer how to operate the machine and how to maintain the machines.

We will give you the machine operation manual and the best formulation for target products that you are going to make.


FAQ


Q: How many days for the install and testing of the machine?


A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.


Q: For the cost of the engineer how much I need to pay?


A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.


Q:What kind of raw material tools we need to prepare for the testing?


A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.


Q: After the machine testing if we need some engineer to stay in our factory can you help to find?


A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.


Q:During the foaming if we have some problems abt the foam and the machine how can we do?


A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.


China Semi Auto Batch Foam Making Machine For Furniture , Sponge Manufacturing Machine supplier

Semi Auto Batch Foam Making Machine For Furniture , Sponge Manufacturing Machine

Inquiry Cart 0