Home /Moulds /

HDPE / XDPE Plastic Roto Molded Fuel Tanks , Oil Tank Mold Made By Rotational Mold

HDPE / XDPE Plastic Roto Molded Fuel Tanks , Oil Tank Mold Made By Rotational Mold

Brand Name:J&C
Model Number:customized sizes
Minimum Order Quantity:1 SET
Delivery Time:35 DAYS
Payment Terms:T/T, L/C, Western Union
Place of Origin:Shanghai, China
Contact Now

Add to Cart

Active Member
Location: Shanghai Shanghai China
Address: #18 Shangyu Road, Xinbang Town,Songjiang District, Shanghai
Supplier`s last login times: within 25 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

HDPE / XDPE Plastic Roto Molded Fuel Tanks , Oil Tank Mold Made By Rotational Mold


Product Description
Poduct Name
HDPE, XDPE plastic fuel tank mold, oil tank mold made by rotational mold
Material
Aluminum A356
Surface treatment
Polish, Sandblasting, Telfon coating
Wall thickness
8-10mm
Mould life
Over 10000 shots
Mould Process
Design, foam, casting, CNC process, Polish, Frame, Test, Packing
Platic Material
LLDPE, MDPE, HDPE, CROSS LINKED PE
Our service
help you design with our professional experience for rotational mold


The principle of rotational molding of plastics is simple. Basically the process consists of introducing a known amount of plastic in powder, granular, or viscous liquid form into a hollow, shell-like mold.The mold is rotated and/ or rocked about two principal axes at relatively low speeds as it is heated so that the plastic enclosed in the mold adheres to, and forms a monolithic layer against, the mold surface. The mold rotation continues during the cooling phase so that the plastic retains its desired shape as it solidifies. When the plastic is sufficiently rigid, the cooling and mold rotation is stopped to allow the removal of the plastic product from the mold. At this stage, the cyclic process may be repeated. The basic steps of (a) mold charging, (b) mold heating, (c) mold cooling, and (d) part ejection.


RFQ


Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 35 days after confirming drawing and receive advanced payment.

Q: Do you provide samples once open mould?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: 50% advanced payment, the balance before shippment.

China HDPE / XDPE Plastic Roto Molded Fuel Tanks , Oil Tank Mold Made By Rotational Mold supplier

HDPE / XDPE Plastic Roto Molded Fuel Tanks , Oil Tank Mold Made By Rotational Mold

Inquiry Cart 0