Home /

Galvanized W Beam Expressway Metal Roll Forming Machine 22KW Hydraulic Decoiler

Galvanized W Beam Expressway Metal Roll Forming Machine 22KW Hydraulic Decoiler

Brand Name:Sussman
Certification:CCC, SGS, ISO9001, CE
Model Number:SM-GRM
Minimum Order Quantity:1 set
Delivery Time:75days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Wuxi Jiangsu China
Address: NO.18-1, Funan road,Wenlin, Zhutang Town, Jiangyin city, Jiangsu province, China.
Supplier`s last login times: within 28 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Galvanized W Beam Expressway Metal Roll Forming Machine 22KW Hydraulic Decoiler


1.The system is easy to operate and use. PLC:Panasonic(Can customize as customer require)
2.The surface of the final product is very smooth and beautiful without any scratch on the surface.
3.Controlling by computer, PLC display, operation is easy, running is steady and reliable,endurable,maintenance-free.


Technical Parameter


Item

Specification

Steel Sheet Thickness

2-3mm (depend on requirement )

Material of blad

Cr12Mov, quenching treatment

Capacity of Decoiler

5 Ton hydraulic decoiler

Forming Speed

5-8m/min(not including punching time)

Roller Groups

about 13 stations main roller

Roller Material

GCr15, quenching treatment

Roller Diameter

180mm

Principal Axis

45# high grade steel with quenching treatment

Main Motor Power

22 Kw

Hydraulic Power7.5KW
Transmiss wayGearbox

Main Components


Equipment nameName
Decoiler1 set

Feeding& guide device

1 set
Punching device1 set
Main roll forming machine1 set
Hydraulic station1 set
Control box system1 set
Cutting device1 set
Run out tables1 set

Applications


Highway Guard Rail


Working Flow


Decoiler ---- Feeding --- Levelling---Punching--- Roll Forming ---- Cutting ---- Run out tables


Machine Photo


Installation of the machine


The individual components of the machine are installed according to the layout and prepared for the commissioning.
The installation comprises of:
- Installation by Sussman service technicians.
- The following services are included:
- Installation of the machine components.
- Adjustment of the machine components.
- Connection of all motors to the control cabinet.
- Installation of the required safety devices.
Delivery extent does not comprise of:
- Media supply (electrics, compressed air, etc.)to the machine(control cabinet)
- Raw material process material and fuels
- Raw material for test blocks
- Transport and lifting devices
- Auxiliary staff.
The operators of the plant should be present during the installation in order to become familiar with the new machines.


Commercial Conditions


1. Port of Loading: FOB Shanghai
2. Delivery time: 75 days after technical clearance and down payment
3. Payment: 30% TT in advance, balance before delivery
4. Assembly and comissioning: Two engineers will visit buyer's workshop for install, commission and training, the salary of our engineer cost USD100 per day. The customer should ensure the pre-installation being carried out appropriately.
5. Warranty: 12 months warranty starting from the date of the successful installation and commissioning of the equipments.

China Galvanized W Beam Expressway Metal Roll Forming Machine 22KW Hydraulic Decoiler supplier

Galvanized W Beam Expressway Metal Roll Forming Machine 22KW Hydraulic Decoiler

Inquiry Cart 0