Home /Mining Machinery /

Mining 220V 180m Water Well Drilling Equipment

Mining 220V 180m Water Well Drilling Equipment

Brand Name:ShiTan
Certification:ISO9001
Model Number:GK-180
Minimum Order Quantity:Negotiation
Delivery Time:Within 7-12 days
Payment Terms:L/C, D/A, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Village,Jinzhou City,Hebei province,China
Supplier`s last login times: within 2 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

water well core drilling rig , 180m mine borehole rock drill rig


Application:


Mining 220V / 380V Water Well Drilling Equipment , 180m Core Drilling Machine

Name: GK-180-1 core drill

GK-180-1 drilling rig is developed to synthesize the advantages of various drilling rigs. The new kind of shallow hole drilling rig is mainly used in engineering geological survey and secondly used in core drilling.


Application and scope


1.1 Engineering geological investigation of railways, hydropower, traffic, bridges, dam foundations and other buildings.

1.2 Geological core drilling, physical prospecting.

1.3 Small grout Confucius, drill hole drilling.

1.4 Small well drilling.

The drilling rig is equipped with a ball mounted card blessing mechanism with six side active drill rods. The utility model can perform no stopping and falling rod. And it has the advantages of high work efficiency, convenient operation, safety and reliability. It is compact, small in size, light in weight, strong in decomposition and easy to remove .


product parameter


Drilling Rig
Drilling diameter(mm)75,91,110,130,150,300
Drilling depth (m)180,150,100,70,50,30
Drill pipe diameter (mm)42,50
Drilling angle(°)90~75
Equipment size(L * B * H)1750 * 780 * 1273 (mm)
Rig weight (except engine)595
Gyrator
Spindle speed (four gear) (r/min)71,182,310,790
Spindle maximum feed pressure(KN)15
Spindle maximum lifting force(KN)25
Spindle maximum output torque(KN• m)1.5
Winch assembly
Winch maximum lifting force (single rope)20
Reel speed (r/min)20,39,85,170
Reel circumferential speed(m/s)0.172,0.345,0.738,1.476
Reel diameter(mm)140
Wire rope diameter(mm)9.3
Wire rope density (m)40
Brake diameter(mm)278
Brake band width (mm)50
Water pump
Pump typeHorizontal single cylinder double acting
Maximum displacement (motor)(L/min)95(77)
Work pressure (Mpa)1.2
Cylinder diameter (mm)80
Piston stroke(mm)100
The maximum allowable pressure (Mpa)1.2
Oil pump
Oil pump typeYBC -20/125
Nominal pressure (Mpa)12.5
Rated flow(ml/r)20
Rated speed(r/min)800-1500
Diesel engine or motor
Diesel engineZS 1115
Rated power (KW)16.2
Rated speed (r/min)2200
Rated pressure(Mpa)11
Motor typeY160 - 4

FAQ


Q1. How to choose the right model?

A:
1.Make sure of the diameter and the depth of hole to be drilled.
2.Make sure of the ground type to be drilled.

Q2. What about the lead time?

A:Needs 3-5 days, mass production needs 1-2 weeks.

Q3. How do you ship the goods and how long does it take to arrive?

A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 3-5 days to arrive. Airline and sea shipping also optional.

Q4. How to proceed an order for Drilling Machine?

A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer places deposit for formal order.
Fourthly We arrange the production.


China Mining 220V 180m Water Well Drilling Equipment supplier

Mining 220V 180m Water Well Drilling Equipment

Inquiry Cart 0