Home /Machine Tool Equipment /

Automatic Continous Sponge Production Line for Foam Mattress Latex / Mattress Memory Sponge

Automatic Continous Sponge Production Line for Foam Mattress Latex / Mattress Memory Sponge

Brand Name:ZHMACH
Certification:CE Certificate
Model Number:ZFP-2017
Minimum Order Quantity:one set
Delivery Time:45 days
Place of Origin:Guangdong China (Mainland)
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Supplier`s last login times: within 30 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Automatic Continous Sponge Production Line for Foam Mattress Latex / Mattress Memory Sponge



Product Description

Continuous Automatic Low Pressure Foaming Machine with R.S. Pulling System is the automatic horizontal continously foaming machine that make the furniture foam like sofa and mattress. The standard machine was together with 13 kinds of raw material.


For the process of foaming:


Loading all the raw materials inside the material tank with the loading system--control the temperature of the raw material inside the tank with the chiller--check the flow of all the raw materials before foaming--make some small sample test before foaming (make sure the flow and everthing is correct)--Put the karft paper and the plastic film-- foaming process


[Specifications]


DimensionL33M×W4M×H3M
Foaming width980mm~2250mm
Foaming heightUnder 1200mm
Foaming density8kg/m3~100kg/m3
Foaming speed2000rpm~7000rpm


(1)The whole machine parts specifications:


1. Foaming control Platform(standard) L3m×W2.52m×H0.7m
2. Oven declining board (standard) L9m×W0.98m~2.30m
3. Oven side links(standard) L18m×W2.3m×H1.2m
4. Oven machine frame(standard) L18m ×W4m×H3m
5. Oven inner conveyer line (standard) L18m×W2.3m×H0.83m
6. Foam block cutter machine (standard) W2.3m×H1.30m(saw/knife with cross type )

MotorGuangdong brand
PumpViking pump & Chinese pump
InvertorSiemens brand
PLCSiemens
TemperatureControl system

TypeUseSpecificationQty
Big material tankPPG5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
Big material tankPOP5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

1


Big material tankCaCo35m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system1
Big material tankTDI5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1


Big material tankFlame retardant2m³/δ3m stainless steel, with filter system1
Big material tankMC2m³/δ2mm stainless steel, with filter system1
Small material tankSi180L/δ1mm stainless steel1
Small material tankA-33180L/δ1mm stainless steel, with filter system1
Small material tankT9180L/δ1mm stainless steel, with filter system1
Small material tankH2O180L/δ1mm stainless steel1
Small material tankColor180L/δ1mm stainless1
Small material tankAnti-yellow180L/δ1mm stainless steel1
Small material tankBlack180L/δ1mm stainless steel1
Floor powder mixing tankPPG, POP, Powder1.5m³/δ3mmA3 steel plate, with filter system1
Filter tankPOP, Powder1.5m³/δ4mmA3 steel plate1
Packing & shiping

How is the packing of the machine?

The entire machine will be nude packing. Some of the parts will be pack in wooden case. Others will be simple pack with paper or foam sheet with plastic film.

How many container will be needed for the whole set of machine?

Total three containers is enough 2*40HQ+1*20GP. In order to save the place and the cost of delivery we will also put some parts that inside the raw material tank.

We will try the best way to pack all the machine well and also save the freight cost.

FAQ

Q: How many days for the install and testing of the machine?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.

Q:During the foaming if we have some problems abt the foam and the machine how can we do?

A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.



You are warmly welcome come and visit our factory.


automatic foaming machine line.pdf

China Automatic Continous Sponge Production Line for Foam Mattress Latex / Mattress Memory Sponge supplier

Automatic Continous Sponge Production Line for Foam Mattress Latex / Mattress Memory Sponge

Inquiry Cart 0