Home /Used Machinery & Equipment /

High Efficiency PE Foam Sheet Extrusion Line , PVC Foam Board Machine 200~300L/Min

High Efficiency PE Foam Sheet Extrusion Line , PVC Foam Board Machine 200~300L/Min

Brand Name:ZHMACH
Certification:CE
Model Number:ZHF-2017
Minimum Order Quantity:one set
Delivery Time:shipped in 45 days after payment
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan Guangdong China
Address: Industrial Zone of Tangshi, Gaobu town, DongGuan City GuangDong Province,China
Supplier`s last login times: within 30 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

High Effeiciency MattressFoam Production Line Full Automatic 200~300L/min

Horizontal Automatic Continuous Sponge Machine is a automatic continuous foaming machine for producing flexible polyurethane foam used in furniture, shoe material, packing, electron, garment and transportation industrial. It’s the ideal production equipment for large-scale foaming.


(1) The whole machine parts specifications:


1, Foaming controlling Platform (standard) L3m×W2.52m×H0.7m

2, Oven declining board (standard) L6.8m×W0.98m~2.3m

3, Oven side links (standard) L18m×W2.3m×H1.2m

4, Oven machine frame (standard) L18m ×W4m×H3m

5, Oven inner conveyer line (standard) L18m×W2.3m×H0.83m

6, Foam block cutter machine (standard) W2.3m×H1.30m(knife belt with cross type )

7, Side film lift system one set

(2) Main Specification


Oven Length18mInner Conveyer length18m
Foaming Height1.0-1.25mSide Borar Adjustable Width0.98-2.3m
Foaming Width1.0-2.25mConveyer Belt Speed0-8m/min
Foaming Density8-100kg/m3Fall PlateSix section adjustable
Total Power130KWTotal output100-300kg/min

(3) Material pot types: (The work pressure in the pot is normal pressure)


TypeUse

Specification

Qty
Big material tankPPG

5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

1
Big material tankPOP

5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

1


Big material tankCaCo3

5m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system

1
Big material tankTDI

5m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system

1


Big material tankFlame retardant

2m³/δ3m stainless steel, with filter system

1
Big material tankMC

2m³/δ2mm stainless steel, with filter system

1
Small material tankSi180L/δ1mm stainless steel1
Small material tankA-33180L/δ1mm stainless steel, with filter system1
Small material tankT9180L/δ1mm stainless steel, with filter system1
Small material tankH2O180L/δ1mm stainless steel1
Small material tankColor180L/δ1mm stainless1
Small material tankAnti-yellow180L/δ1mm stainless steel1
Small material tankBlack180L/δ1mm stainless steel1
Floor powder mixing tankPPG, POP, Powder1.5m³/δ3mmA3 steel plate, with filter system1
Filter tankPOP, Powder

1.5m³/δ4mmA3 steel plate

1

(4) Marks:
1. According to seller's standard designed drawing diagrame to arrange the production and inspection.
2. if customer reqiure, techincians will be sent by seller, and the turn-round tickets fee, vise fee, $40 per day of allowance fee and hotel accommodation are in charge of buyer.
3. Payments Terms: T/T 30% advance before production.the balance of total amount 70% will be paid before shipment.
4. Delivery forms: Send to ShenZhen Seaport
5. Spare parts: Offer assorted maintain tools.
6. Package: paper & film package.
7. Voltage: all the eqiupments are: 380V, 50HZ, 3P.(Voltage can be changed, but price need to increase 3%)
8. Delivery date: 45 days (after seller get the advance).
9. All the machines maintain for one year, if the damages caused by machine itself, excluding the man-made accidents, the broken parts offered by seller in free of charge, but the transport cost for buyer's account.

FAQ


Q: How many days for the install and testing of the machine?

A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.

Q: For the cost of the engineer how much I need to pay?

A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.

Q:What kind of raw material tools we need to prepare for the testing?

A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.

Q: After the machine testing if we need some engineer to stay in our factory can you help to find?

A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.




China High Efficiency PE Foam Sheet Extrusion Line , PVC Foam Board Machine 200~300L/Min supplier

High Efficiency PE Foam Sheet Extrusion Line , PVC Foam Board Machine 200~300L/Min

Inquiry Cart 0