登录 | 免费注册 | 提交网站 | 免费看询盘 | 外贸旺站免费建站 | "贸易通"多语言推广 | 外贸论坛
Hot Products:
Home > Ladders & Scaffoldings >

Prefab Steel Frame Steel Structure Building For Warehouse

Prefab Steel Frame Steel Structure Building For Warehouse

Brand Name: QHHK
Minimum Order Quantity: 20tons
Delivery Time: 7-10 work days
Payment Terms: L/C, T/T, Western Union
Place of Origin: Shenyang
Price: usd$500-600 per tons
Liaoning QHHK Construction Material Technology Co.,LTD.
Verified Supplier
Shenyang Liaoning China
Business type: Manufacturer Distributor/Wholesaler Agent Importer Exporter Trading Company Seller
Room 202, D07 building SISP, Hunnan District, Shenyang
Supplier`s last login times: within 39 hours

Prefab steel structure Building Material Steel H Beam




PRODUCT DESCRIPTION

Product
Steel Welded H Section
Size
Flange depth
>220mm
Flange width
>160mm
Flange thickness
6mm/8mm/10mm/12mm
Web thickness
6mm/8mm
Standard
AISI, ASTM, BS, DIN, GB, JIS etc.
Material
Q 235B,S235JR,Q345B, S355JR etc.
Application

1.Industrial structure of the steel structure bearing bracket.

2.Underground engineering steel pile and retaining structure.
3.Petrochemical and electric power and other industrial equipment structure
4.Large span steel bridge components
5.Ships, machinery manufacturing frame structure
6.The train, automobile, tractor beam bracket
7.Port of conveyor belt, high speed damper bracket




SERVICE FOR PROJECT
1. Customized design will be provide with free .

We can design complex industrial building for clients by using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc.


2. Steel Structure Building Manufacturing Process:

3. We have many production lines and strong production capacity as follows:

2 fabrication factory tatol area 18000 Sqm!
5 heavy steel structure production lines!
1 assembly workshop that can assembly steel bridge!
Production capacity of steel structure components: 50000 tons per year
Total area of finished steel structure projects: 17600000 m2
We have enough strong production space and production capacity to delivery the goods on time.

4. Quality control.

General fabrication main process of steel structure is divided into: material preparation →cutting→ assembling→ welding→ drilling → assembly → correction → shot blasting and rust removal → painting → number →component acceptance ex-factory. In the steel structure production, according to the steel structure production process flow, grasp the key processes for quality control, such as control of key parts processing, main components of the process, measures, processing equipment, process equipment, etc. Each processing part, we can have strict inspection specifications. Welding engineering is the most important link in steel structure fabrication and installation engineering. For the welding,
We have our qualified CWI welding inspector to control the quality according to AWS-D1.1/D1.5 welding quality system. Spot welding strictly weld according to ASW welding quality system.


PROJECT CASE

International Automobile Research and Development Park No. 2.

Steel amount: 7000tons.
Type: warehouse
Project time: 2018
Project location: Shenyang
Quantity:55000Sqm

Prefab Steel Workshop for Pakistan.

Project size:7062.90Sqm
Steel Structure Quantity: 277.9tons
Dead Loading:0.3KN/m2
Live loading:0.5KN/m2
Wind load: 0.55kn/m2


Please kindly inform us information as below if you are interested our products.

Such as these questions:
Usage: _____ for warehouse,workshop, showroom etc.
Size:
Flange depth
Flange width
Flange thickness
Web thickness
If you are interested in and reply me to talk in detail.
Free design, Order priority production, have the discount on total amount are only prepared for you.

FAQ.

Q1: Can provide OEM/ODM service?
A: Yes. Please feel free to contact us for more details discuss.
Q2: Do you supply installation service?
A: Yes, we do. But you will pay for our professional installation cost at your local place, then we will send the engineers to supervise it.

Q3: How long can the frame be used?
A: The use life of the main structure is the designed used life, usually is 50-100 years (standard request of GB)

Q4: How long is the use life of the roof cover?
A: The use life 50 years

Q5: What is the anti-rust treatment for steel structure?
A:Anti-rust treatment of steel structure
Normal anti-rust paint
Anti-rust paint with epoxy zinc primer
Hot-dip galvanization
Hop-dip galvanization + PU finish
Powder coating
Stainless steel structure: No. 301/304/316 stainless steel structure.


Product Tags:

pre engineered steel structure

      

prefabricated steel frames

      

Prefab Steel Frame Steel Structure Building For Warehouse Images

Send your message to this supplier
From:
Enter your email please.
To: Liaoning QHHK Construction Material Technology Co.,LTD.
Subject:
Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0
Other about

Prefab Steel Frame Steel Structure Building For Warehouse

High Reputation Prefabricated Steel Structures Metal Shed for Waiting Room

Brand Name :zhongda
Minimum Order Quantity :500 Tons

High Welding Steel Frame Structure Iron H Beams

Brand Name :QHHK
Minimum Order Quantity :20tons

Prefab Steel Frame Steel Structure Building For Warehouse

Brand Name :QHHK
Minimum Order Quantity :20tons

Q235 H Channel Steel Building Structures H Beam Steel Grade

Brand Name :QHHK
Minimum Order Quantity :20tons

Prefabricated Railway Station Steel Frame Structure With Space Frame Roof

Brand Name :QHHK
Model Number :GCC SGCH SPCC DX51D+Z